Similar Projects
Generator and Control Panel
Bidding
Houston, TX

OCB Skylight Replacement
Bidding
Houston, TX 77054

Annual for Misc Electrical Wire for Cstores
Post-Bid
Houston, TX 77020

Electrical Equipment, Bulbs and Ballasts and Related Services
Post-Bid
Houston, TX 77270

Standby Generator for Fire Department
Results
Less than $200,000 est. value
Houston, TX

Relocation of Electrical Services and Related Items
Term Contract
Results
TX 77002

Lift Station No. 1 Generator Replacement
Bidding
Houston, TX

H&PE Passenger Elevator Power Unit and Door Operator Package Replacement
Term Contract
Post-Bid
Houston, TX 77004

Construct Electric and Telecommunication Infrastructure Under Port Road and Exxonmobil Corridor
Results
Less than $1,382,996 est. value
Houston, TX

Emergency Power Supply System Equipment at Various Locations
Post-Bid
Houston, TX 77002

Electrical Upgrades at the Wilshire Office for the Harris County Toll Road Authority
Results
Less than $1,000,000 est. value
Houston, TX 77040

Generator Maintenance and Repairs
Post-Bid
Houston, TX 77030

Electrical Modifications for Brondesbury Lift Station
Results
Less than $75,000 est. value
TX

UPS Full Service at 1200 Travis and 611 Walker
Post-Bid
Houston, TX 77002

Natural Gas Emergency Generator
Results
Less than $184,100 est. value
TX

Reported 09/18/2020 12:00 AM
Project Title

1313 Main Street Standby Generator Project

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the installation of a new onsite 350 KW natural gas generator on level 1 of the adjacent Green Street parking garage with bollard protection. To switch to backup power, an 800A open transition, automatic transfer switch (ATS) is to be installed in the first-floor mechanical room. The installation of the ATS will require modifications to the electrical system and equipment inside the mechanical room. The generator will require natural gas service to be established by CenterPoint from the SW corner of Fannin at Clay Street. Contractor is to install 2” HDPE Natural Gas Line from new gas meter to standby generator. Existing trees are to be protected and sidewalk finishes to be restored to existing condition or better by Contractor. Contractor to route conduit and establish electrical connection between generator and existing first floor mechanical room.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents