Similar Projects
Last Updated | 10/18/2021 09:50 AM |
Project Title | Westwood Avenue Stormwater Improvements |
Physical Address | View project details and contacts |
City, State (County) | Springfield, MO (Greene County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To perform the installation of an underground storm system beginning at the detention ba-sin at Wayland St and Westwood Ave, continuing along Westwood Ave, and ending at the detention basin located at Seminole St and Nettleton Ave. This project consists of clearing and grubbing trees, grading within the detention basin located at Westwood Ave and Wayland St, installation of a new water quality control structure and concrete trickle channel, installation of approximately 1100 LF of reinforce concrete storm pipe with depths of up to 15’, curb and gutter, sidewalk, driveway, and pavement replacement, and installation of erosion control and traffic control measures. City Utilities Gas and Water relocations will be required for this project. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |