Similar Projects
Continental Mill Riverwalk Path
Infrastructure
Conception
$391,000 est. value
Lewiston, ME

Airport Landside Terminal Parking Lot - City of Auburn
Infrastructure
Conception
$250,000 CJ est. value
Auburn, ME 04210

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

2023 Crack Sealing of Asphalt Bituminous Pavement
Infrastructure
Bidding
$100,000 CJ est. value
Lewiston, ME 04240

2023 Crack Sealing of Asphalt Bituminous Pavement
Infrastructure
Bidding
$100,000 CJ est. value
Lewiston, ME 04240

Ferry Road Roadway Improvements
Infrastructure
Post-Bid
$430,000 est. value
Lisbon, ME 04250

Hot Mix Shimming and Surface Paving
Infrastructure
Post-Bid
$250,000 est. value
Turner, ME

Intersection Improvements
Results
Auburn, ME 04210

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Results
$25,000 to $100,000 est. value

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Construct Corporate Hangar - City of Auburn
New Construction, Infrastructure
Conception
$975,000 CJ est. value
Auburn, ME 04210

Redundant Water Transmission Main Installation - City of Lewiston
Infrastructure
Design
$5,500,000 CJ est. value
Lewiston, ME 04241

Haley Street, Warren Ave, and Webber Ave Water Main Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Lewiston, ME 04240

Last Updated 03/20/2023 01:41 AM
Project Title

Airport Landside (Auto) Terminal Parking Lot Reconstruct Landside - City of Lewiston

Physical Address View project details and contacts
City, State (County) Auburn, ME 04210   (Androscoggin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Finish planned and DEP-permitted reconstruction of the airport terminal parking lot so it conforms to current codes and modern safety standards. The request is based on bids received and the inflation costs of pavement. The additional costs take into consideration instailing the electric vehicle charging stations and the expansion of the Airport's business which will increase the number of employees and based aircraft owners. This project is in included in the City of Lewiston FY 2024 - 2038 CIP. As of March 20, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents