Similar Projects
US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

SR 410/1.0 miles E of Chinook Pass Summit - Culvert Lining
Infrastructure
Conception
$1,436,000 CJ est. value
Naches, WA 98937

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Design
$735,000 CJ est. value
Toppenish, WA 98948

White Swan Water Source Improvements
Infrastructure
Bidding
$500,000 CJ est. value
White Swan, WA 98952

USDA-ARS Temperate Tree Fruit and Vegetable Research Unit Asphalt Improvement Project Wapato WA
Infrastructure
Bidding
$100,000 CJ est. value
Wapato, WA 98951

Dollar General #23747 / Harrah
New Construction, Infrastructure - 12,480 SF
Post-Bid
$2,000,000 CJ est. value
Harrah, WA 98933

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Collection System Improvements - Phase 1
Infrastructure
Results
$1,204,118 CJ est. value
Yakima, WA 98901

Yakima River at Union Gap Ecosystem Restoration Project
Infrastructure
Results
$11,992,725 CJ est. value
Yakima, WA 98901

1st Level Reservoir Repair and Improvements
Infrastructure
Construction
$1,098,042 CJ est. value
Yakima, WA 98901

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

Childrens Village Expansion
Addition, Infrastructure, Renovation - 11,000 SF
Pending Verification
$6,400,000 CJ est. value
Yakima, WA 98902

I-82 / Columbia River Bridge WB - Deck Rehabilitation
Infrastructure, Renovation
Conception
$1,480,000 CJ est. value
Sunnyside, WA 98944

SR 241 / Allen Rd Intersection - Intersection Safety
Infrastructure
Design
$677,000 CJ est. value
Sunnyside, WA 98944

Last Updated 03/20/2023 05:07 PM
Project Title

Library and Community Center

Physical Address View project details and contacts
City, State (County) Union Gap, WA 98903   (Yakima County)
Category(s) Entertainment/Recreation, Government/Public, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Library - Public, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,867,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Bid Cost Range: $1,875,000 to $2,300,000 A single bid is required for the project including alternates on the same bid form to include all General, Mechanical, Electrical and associated work. Submit each bid in accordance with project bidding and Construction Document requirements. A Bid Bond, or Cashier's Check, made payable to City of Union Gap, in the amount of not less than five percent (5%) of the total amount of the Basic Bid, is required. Performance and payment bonds for 100% of the contract amount will be required as a condition of entering into a contract with the successful bidder. All work performed on the project will be subject to Washington State Prevailing Wage Rates. This document and the materials enclosed herewith constitute an invitation to submit bid proposals only, and do not represent an offer by the City of Union Gap. Bid proposals submitted in response hereto shall constitute offers to contract with City of Union Gap, and only upon the City of Union Gap acceptance of such offer by bid award as provided herein shall any contractual relations be created. City of Union Gap is an equal opportunity and affirmative action employer. Locally owned firms, minority-owned firms, women-owned firms, and small businesses are encouraged to respond. The Owner reserves the right to reject any or all bids or to accept the bid deemed best for the Owner and to waive any informalities. No bidder may withdraw his bid after the hour set for receiving the bids, or before the award of contract, unless said award is delayed for a period exceeding 45 days. By the order of the City of Union Gap. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Liquidated damages at $1,000.00 per day

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents