Similar Projects
Last Updated | 10/12/2022 02:38 AM |
Project Title | Lakeview Middle School Addition and Remodel |
Physical Address | View project details and contacts |
City, State (County) | Battle Creek, MI 49015 (Calhoun County) |
Category(s) | Education, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,000,000 [brand] Estimate |
Plans Available from | Plan Holders - 10/12/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of a two-story classroom addition to the existing middle school building. Existing classroom spaces will be remodeled with new finishes and MEP upgrades. Extension of entrance vestibules for student entrances. Existing office spaces are to be reconfigured and remodeled with new finishes and MEP upgrades. Sitework includes parking lot and stormwater retention upgrades, including an extension to the student drop off lane around the west side of the building. The anticipated timetable of key dates for this bid are as follows: Documents available for Contractors October 12, 2022 Pre-bid and Site Walk-thru October 14, 2022, 1:00 PM RFI questions cut off October 27, 2022, 3:00 PM Bid Due Date November 3, 2022, 1:00 PM Bid Opening (in person) November 3, 2022, 1:00 PM Post-bid Interviews November 7, 2022 - November 11, 2022 Award to Contractor November 22, 2022 Bids received after specified date and time will not be accepted and will be returned unopened. Bids will be accepted as single "Bid Packages", or "Combination Bid Packages" as determined to be in the Owner's best interest. Combination bids shall be submitted in separate envelopes. Fillable bid forms and other project forms can be found in the "Project Forms" folder in our online plan room. Required; Bid bond or certified check of not less than 5% of the bid amount shall be submitted with bid and made payable to Lakeview School District. PREVAILING WAGE: This is not a prevailing wage project FAMILIAL RELATIONSHIP DISCLOSURE: All proposals shall be accompanied by a sworn and notarized statement disclosing any familial relationship (or lack of a relationship) that exists between the owner or any employee of the bidder and any member of the Board of Education of the Lakeview School District or the Superintendent of the School District. The District shall not accept a bid that does not include a sworn and notarized disclosure statement. IRAN ECONOMIC SANCTIONS ACT: Additionally, each bid shall be accompanied by a disclosure statement indicating that they have not been doing business with companies having ties with the country of Iran in accordance with the Iran Sanctions Act. TYPE OF CONTRACT: The base bid shall be a lump sum amount, for the work as set forth in the bid documents. CONTRACT SECURITY: Payment and Performance Bonds will be required for all awarded contracts in excess of $50,000 and the cost of these bonds is to be included in your base bid. All packages less than $50,000 must state, as an alternate, the cost of providing Payment and Performance Bonds. RIGHTS RESERVED: The Owner reserves the right to accept or reject any and all bids, alternates, or proposals, and to accept bids, alternates, or proposals that, in its sole judgment, serve its best interests. |
||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, Addition, Addition. 2 Stories Above Grade, Remodeling, Remodeling.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |