Similar Projects
Esports Arena
New Construction
Conception
$28,000,000 est. value
Sandusky, OH

Siddall Hall Renovation
LEED Certification, Renovation
Post-Bid
$78,500,000 CJ est. value
Cincinnati, OH 45219

Siddall Hall Renovation
LEED Certification, Renovation
Post-Bid
$78,500,000 CJ est. value
Cincinnati, OH 45219

CWRU South Residential Campus - Phases I - II
New Construction
Pending Verification
Cleveland, OH 44106

RFQ D/B - Bathroom Renovations in Wings 1C and 1D of the Main Building at the Dayton Job Corps Center
Term Contract, Demolition, New Construction, Renovation
Post-Bid
$5,000,000 CJ est. value
Dayton, OH 45417

CS Turner Schneider HVAC DDC Connect
Renovation
Bidding
$280,000 CJ est. value
Cincinnati, OH 45219

RFQ Design - Bryan Hall HVAC and Life Safety Upgrades 2022
Renovation
Pending Verification
$8,400,000 CJ est. value
Athens, OH 45701

CWRU South Residential Campus
New Construction, Infrastructure - 195,900 SF
Construction
$54,000,000 CJ est. value
Cleveland Hts, OH 44106

Attic Insulation Ignition Barrier
Renovation
Post-Bid
$630,000 CJ est. value
Oxford, OH 45056

Cedarville University Residence Hall
New Construction, Infrastructure
Pending Verification
$34,200,000 CJ est. value
Dayton, OH 45402

John Carroll University South Gateway
Demolition, New Construction, Infrastructure - 346,837 SF
Pending Verification
$185,000,000 CJ est. value
University Heights, OH 44118

Last Updated 03/15/2023 02:12 PM
Project Title

RFQ D/B - Baker Mezzanine Elevator

Physical Address View project details and contacts
City, State (County) Columbus, OH 43210   (Franklin County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $827,612 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Prevailing Wages State The scope of services for this project shall include criteria design services for the renovation of existing elevator that services the mezzanine space located within Baker Hall (residence building on south campus). The general scope of renovation will include modernization of an existing drive drum elevator. Renovation will include a new cab as well as converting from its existing mechanical basement drive to hydraulic. The intent of the project is to improve safety and reliability for Baker Hall occupants and to accommodate better utilization of the mezzanine space. The Criteria Design for this project will need to account for other approved projects that will be working in close proximity to this project. For projects advertised with an appropriately developed Program of Requirements ("POR"), upon award of the Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by developing the Program of Requirements. The selected Criteria Architect/Engineer ("C-A/E"), as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner/Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Growth, Diversity & Equity ("EDGE") Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Concept and Design Criteria, Best Value Selection, Preconstruction, Construction and Closeout, and Additional Services of all types including Schematic Design and Design Development if a Design-Builder is not engaged to perform these services. Professional Services Start 04 / 2023 Construction Notice to Proceed 08 / 2023 Substantial Completion of all Work 08 / 2024 Professional Services Completed 10 / 2023 Submit all questions regarding this RFQ in writing to Todd Henderly at henderly.8@osu.edu with the project number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website at http://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. The scope of services for this project shall include criteria design services for the renovation of existing elevator that services the mezzanine space located within Baker Hall (residence building on south campus). The general scope of renovation will include modernization of an existing drive drum elevator. Renovation will include a new cab as well as converting from its existing mechanical basement drive to hydraulic. The intent of the project is to improve safety and reliability for Baker Hall occupants and to accommodate better utilization of the mezzanine space. The Criteria Design for this project will need to account for other approved projects that will be working in close proximity to this project

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents