Similar Projects
Fenton HS Ionization Existing Mechanical Equipment
Results
Bensenville, IL 60106

Boiler and Hot Water Heater Maintenance
Term Contract
Post-Bid
Lisle, IL

Weatherization - Mechanical Services
Alteration
Results
IL

Addison Trail HS Classroom Partition
Alteration
Post-Bid
Addison, IL 60101

Blackhawk Middle School Chiller Replacement
Alteration
Post-Bid
Bensenville, IL 60106

2022 Boiler Replacement
Alteration
Results
Addison, IL 60101

Boiler Replacement at Multiple Schools
Alteration
Results
$35,000 to $45,000 est. value
Bartlett, Elgin, Streamwood, Wayne, IL 60120

Mechanical Unit Replacement
Alteration
Results
Aurora, IL

Domestic Water Heater
Alteration
Post-Bid
Wheaton, IL 60187

Sunset Pool Heater Replacement
Alteration
Results
Glen Ellyn, IL

Replacement Centralized Hot Water System
Alteration
Post-Bid
Saint Charles, IL

Boiler/Heat Exchanger Rehabilitation
Alteration
Results
Wheaton, IL

2022 Mechanical Project at Kennedy Junior High School
Alteration
Results
$400,000 est. value
Lisle, IL 60532

Boiler Burner
Alteration
Results
$250,000 est. value
Woodridge, IL

Lakeview Junior High Water Heater Replacement
Alteration
Results
$210,000 est. value
Downers Grove, IL 60516

Last Updated 10/28/2022 10:10 AM
Project Title

2023 Mechanical Work, Concord Elementary School

Physical Address View project details and contacts
City, State (County) Darien, IL 60561   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders will be required to complete a Registered Plan Holder Record form and a Bidding Documents License Agreement for the Project. Upon receipt of a completed Registered Plan Holder Record form and a Bidding Documents License Agreement, prospective bidders will be sent bidding documents and will become registered plan holders. BIDDER RESPONSIBILITY Each Bidder must satisfactorily complete the Bidder Responsibility process described in Section 01 00 00 - Bidder Responsibility Criteria of the Project Manual by providing the required Documents. In the case of a joint venture or partnership, each joint venturer or partner must independently meet each of the requirements set forth in Paragraphs 1.02, 1.03, 1.04 and 1.05 in Section 01 00 00 - Bidder Responsibility Criteria. The required Documents must be delivered along with the bidder's sealed bid at the same place and time required for the bid. Contents of each bidder's Responsibility Criteria Documents will be available for public review. The Bidder Responsibility Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder. Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to not less than ten percent (10%), of the bid and made payable to Cass School District 63. No bid shall be withdrawn for a period of thirty (30) days after the bids opening date without the consent of the Owner. Checks or drafts of unsuccessful bidders will be returned as soon as practical after opening and checking the bids. Successful bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et.seq.). The Owner reserves the right to reject any or all bids and to waive any informalities in bidding.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents