Last Updated | 06/01/2023 02:40 PM |
Project Title | Green Island Road Rule 20 A/B Utility Undergrounding Project |
Physical Address | View project details and contacts |
City, State (County) | American Canyon, CA 94503 (Napa County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,766,867 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Green Island Road Rule 20 A/B Utility Undergrounding ProjectThe City Clerk's clock will be used to make the official determination of the time bids are submitted. Sealed proposals should be addressed as follows: City Clerk GREEN ISLAND ROAD RULE 20 A/B UTILITY UNDERGROUNDING PROJECT PROJECT NUMBER TR16-0703 City of American Canyon 4381 Broadway, Suite 201 American Canyon, California 94503 GENERAL WORK DESCRIPTION The project consists of the following general work pursuant to the conversion of existing overhead power, telecom, fiber-optic, and cable utility lines along Green Island Road, underground into a joint trench facilitiy: 1. Potholing of existing utilities 2. Site clearing and demolition 3. Excavation/ backfill and placement of new conduit and equipment enclosures; 4. If required, pavement and landscape restoration. All work is to be done under contract, in accordance with the plans, specifications and drawings contained within and accompanying the CONTRACT DOCUMENTS. The Contract Proposal must be completed in its entirety and submitted on the forms contained in the CONTRACT DOCUMENTS. Any proposal which is incomplete will be rejected. Bid results will be available on the City's website at City of American Canyon, CA : Bids & Notices. LICENSE No bid will be accepted from a bidder who is not licensed in the State of California as a Class A License, (licensed in accordance with the provisions of Division 3, Chapter 9, of the Business and Professions Code of the State of California). BONDS The successful Contractor will be required to furnish, with the Agreement, a Faithful Performance Bond in the amount of one hundred percent (100%) of the Agreement price and a Payment for Labor and Materials Bond in the amount of one hundred percent (100%) of the Agreement price. The successful Contractor will be required to furnish, prior to issuance of a Notice of Completion, a Warrantee Bond in the amount of ten percent (10%) of the final Agreement price. The successful Contractor shall also furnish Certificates of Insurance evidencing that all insurance coverage required by the CONTRACT DOCUMENTS has been so secured. PREVAILING WAGES Prevailing wages are required on this Contract. The ENGINEER of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR online, or from the Department's Labor Compliance Office of the district in which the work is located. BID SECURITY All Contract Proposals shall be accompanied by a cashier's or certified check payable to the order of the City of American Canyon, amounting to ten per cent (10%) of the bid, or by a Bid Bond in said amount, on the form included within the Contract Proposal. Said check shall be forfeited, or said bond shall become payable, in case the Bidder depositing same does not complete the requirements as defined in the CONTRACT DOCUMENTS in the time set forth herein below. MANDATORY REGISTRATION PROGRAM FOR PUBLIC WORKS PROJECTS Contractors must comply with the Department of Industrial Relations (DIR) compliance monitoring unit and labor compliance program. Contractors are required to register before bidding on and entering into contracts for state and local public works projects. GENERAL INFORMATION Requests for information may be directed to the Public Works Department: Engineering Division City of American Canyon 4381 Broadway, Suite 201 American Canyon, CA 94503 For general information, call (707) 647-4559. For technical information, e-mail Ron Ranada, Senior Civil Engineer, at rranada@cityofamericancanyon.org Technical questions and Requests for Information will not be accepted after 12:00 p.m. on Thursday, October 20, 2022. AWARD AND EXECUTION The Contractor shall execute required documents within seven (7) calendar days after the Notice of Award; shall begin work within ten (10) calendar days of issuance of the Notice to Proceed; and shall complete work within eighty (80) working days of issuance of the Notice to Proceed. The City Council reserves the right to reject any and all proposals, to waive any irregularities, and to award the contract to other than the lowest Bidder. No Bidder may withdraw their Contract Proposal for a period of sixty (60) days after the bid opening. Copies of the CONTRACT DOCUMENTS may be examined or obtained at the stated address herein. The project consists of the following general work pursuant to the conversion of existing overhead power, telecom, fiber-optic, and cable utility lines along Green Island Road, underground into a joint trench facility: 1. Potholing of existing utilities 2. Site clearing and demolition 3. Excavation/backfill and placement of new conduit and equipment enclosures; 4. If required, pavement and landscape restoration. The Engineer's Estimate for the project is $1,820,000. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |