Similar Projects
Phase 2 Grading and Drainage Improvements Cozy Point Ranch
Infrastructure
Bidding
$400,000 CJ est. value
Snowmass Village, CO 81615

Construction of the Highway 105A Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Woodmoor, CO 80132

Concrete Contractors for Pouring Concrete Slabs at the Alamosa K-2 Elementary School
Post-Bid
Alamosa, CO 81101

Construct Vehicle Storage for High-Altitude Army Aviation Training Site (HAATS)
New Construction, Infrastructure - 6,191 SF
Post-Bid
$1,700,000 CJ est. value
Gypsum, CO 81637

NCCWTP Concrete Repairs
Results
$100,000 to $130,000 est. value
Denver, CO

Operations On-Call Concrete Replacement and Repair
Alteration
Results
Lafayette, CO

2023 Paving Program
Infrastructure
Construction
$760,000 CJ est. value
Firestone, CO 80520

Concrete Improvements - W. 32nd Street
Infrastructure
Bidding
$400,000 CJ est. value
Pueblo, CO 81008

Various Concrete Projects/Repairs
Alteration
Post-Bid
CO

Precast Foundations
Alteration
Results
Fort Collins, CO

RFP D/B - Steel Storage Shed - Ice Slicer Bin
Renovation
Bidding
$228,000 CJ est. value
Dacono, CO 80514

Concrete Repairs and Replacement Services
Term Contract
Post-Bid
Westminster, CO

Canvas Stadium Concourse Sealing
Alteration
Results
Fort Collins, CO 80523

2023 Chipseal, Crackseal, Fogseal, and Citywide Striping Projects
Infrastructure
Bidding
$500,000 CJ est. value
Woodland Park, CO 80863

Berthoud Brick Stair Repair
Alteration
Post-Bid
$200,000 est. value
Golden, CO 80401

Last Updated 05/16/2023 11:21 AM
Project Title

Transit Lifts and Pitfills

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $440,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be done in two phases, the first phase is to remove the current maintenance pit, by removing the exhaust system, lighting and re-working the drainage. Then filling the pit with flow fill and finish with concrete. The second phase will be to remove the current inground lift and prep the area for the new inground lift. Drawings for both projects are included in the RFP. This is a working Bus maintenance shop; the chosen contractor will complete phase one and proceed to phase two once phase one area has cured and can be driven on. LOCATION OF WORK: All work is located at the City of Greeley Transit Facility "GET" and equipment maintenance 1300 A street, Building A. Question Acceptance Deadline : 04/28/2023 02:00 PM EDT Questions are submitted online : No

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents