Similar Projects
Ditch 53-62 Main Trunk Repair
Infrastructure
Post-Bid

Grading, Bituminous Surfacing, Lighting, and ADA Improvements
Infrastructure
Results
$7,000,000 est. value
MN

2021 Chip Seal and Parking Lot Chip Seal
Post-Bid
$163,426 est. value
Brainerd, MN

2022 Cuyuna Lakes State Trail Extension - West Segment
Infrastructure
Results
$280,000 est. value
Brainerd, MN

Cuyuna Country State Recreation Area Maroc Trail Bridge and Channel
Renovation, Infrastructure
Results
$330,000 est. value
Riverton, MN

CSAH 13 Reconstruction Between TH 371 and CR 137
Results
$2,500,000 to $3,000,000 est. value
MN

2022 Street and Utility Improvement Project
Infrastructure
Bidding
$2,000,000 est. value
Crosby, MN

Roundabout at CSAH 49 and CSAH 5
Infrastructure
Results
$1,148,865 est. value
MN

North Brainerd Reconstruction
Infrastructure
Results
$400,000 est. value
Brainerd, MN 56401

2021 Cracking Sealing and 2021 Parking Lot Chip Sealing
Post-Bid
Brainerd, MN

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

County Road 113 Culvert Improvements
Infrastructure
Results
$333,793 est. value
MN

Nisswa Lake Public Water Access Reconstruction
Infrastructure
Results
Nisswa, MN

2021 Crosby Sidewalk Improvement
Infrastructure
Results
Crosby, MN

Bituminous Leveling, Overlay, Class-1/Topsoil Shouldering, and Striping, Culvert Removal
Infrastructure
Results
Merrifield, MN 56465

Last Updated 06/28/2022 01:33 AM
Project Title

Cuyuna State Recreation Area Portsmouth Campground Trail

Physical Address View project details and contacts
City, State (County) Ironton, MN 56455   (Crow Wing County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work included Temporary sediment and erosion control installation and maintenance. Grading. Installation of accessible bituminous trail and signs. Reinforced concrete parking pad. Extension of corrugated aluminum culvert.

Details

Division 10 - Specialties, Signage.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents