Similar Projects
Last Updated | 12/08/2022 10:44 PM |
Project Title | Calafia Pump Station Flow Meter and Vault Replacement |
Physical Address | View project details and contacts |
City, State (County) | San Clemente, CA 92672 (Orange County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $79,500 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove and dispose the existing precast concrete flowmeter vault and all the equipment inside of vault which consists of flow meter, piping, sump pump and miscellaneous electrical conduits. Furnish and install a larger precast concrete meter vault, piping and electrical conduits and wiring and install new flow meter and transmitter (both provided by City) and sump pump (provided by City) for a fully functional system. Type of Award Lump Sum Liquidated Damages $500/day Project Duration 40 working days Online Q&A Yes Q&A Deadline 11/28/2022 2:00 PM (PST) |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |