Similar Projects
OR47: Nehalem River Bridge Project on the Nehalem Highway
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

Southern Oregon Seismic Bridge Retrofit (Phase 2)
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
OR

OR6: Mills (Wilson River) Bridge Project on the Wilson River Highway
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

Old Highway 99N: Oakland Bridge and Melrose Road: Conn Ford Bridge Project Oakland Shady Highway
New Construction, Infrastructure
Bidding
OR

Last Updated 09/24/2021 07:23 AM
Project Title

Coleman Ck. (Phoenix) Project on the Rogue Valley Highway (Rt. No. OR99)

Physical Address View project details and contacts
City, State (County) Phoenix, OR   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

OR99: Coleman Ck. (Phoenix) Project on the Rogue Valley Highway (Rt. No. OR99) in Phoenix. FAP No. S063(037). ($ 2,000,000 - $ 5,000,000). Req. approx. 1,260 ft2 temp. signs; 3 ea. PCMS; 400 hr flaggers; 912.5 ft temp. barr.; 2,700 ft2 temp. walks; temp. water manage. facil.; temp. work access & contain.; temp. retaining walls; 1,300 ton contam. soil disp.; const. surv. work; 675 yd3 gen. exc.; 380 ft drn. pipe; 403 ft strm. sewer pipe; 6 ea. conc. MH; 2,162 yd3 str. exc.; 674 yd3 gran. str. backfill; 70 yd3 gran. wall backfill; 1,895 ft furn. stl. piles; 45 ea. drv. stl. piles; 20,665 lbs. reinf.; 32,275 lbs. coated reinf.; 320 yd3 str. conc.; 393 yd2 reinf. conc. br. end panels; 661 ft PCPS slabs; 164 ft comb. br. rl.; 574 ft2 CIP conc. retain. wall; 62,225 lbs. stl. lagging; 1,100 yd2 cold pln. pvmt. rem.; 750 ton agg. base; 700 ton ACP (40 ton PG 64-22 asph. cem.); 585 ft conc. curb; 5,715 ft2 conc. islands, drvwy., walks; 2,255 ft thermo. striping; 38.3 ft2 signs; water qual. swale; 1 ac. mulching; 152 ft CL fence; streambed enhancement. Completion Time: September 30, 2022. Class of Work: Bridges and Structures

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.