Similar Projects
Holmes Boulevard Force Main Replacement
Bidding
Holmes Beach, FL 34217

Harbour Drive Force Main Replacement
Bidding
Naples, FL 34103

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Grand Ridge Sewer Extension Hwy 69
Results
Grand Ridge, FL 32442

City-Wide Rehabilitation of the Sanitary Sewer System
Results
$544,555 to $1,319,648 est. value
North Miami, FL 33161

Sea Otter Path Sewer Addition Project
Bidding
$160,000 est. value
FL

SR 20 Forcemain Upgrade - Lafayette L.S. to South Jackson Street and US-331 Forcemain Repair at Jolly Bay Road
Post-Bid
Santa Rosa Beach, FL

Maintenance of Stormwater and Sanitary Sewer Structures
Results
Less than $150,000 est. value
North Miami, FL 33161

Purchase of Sewer Pipe and Fittings
Bidding
Lake City, FL

US-98 Sanitary Force Main Improvements
Post-Bid
$600,000 to $700,000 est. value
Sebring, FL 33876

Grates, Boxes, Manholes
Results
De Land, FL 32720

Gravity Sewer Manhole and Cover, Purchase of
Post-Bid
West Palm Beach, FL 33415

Miscellaneous Manhole Rehabilitation Annual Purchase Agreement
Term Contract
Results
Largo, FL 33779

RFP for Stillwater Phase 1 Force Main Reuse Upsizing
New Construction
Post-Bid
Saint Augustine, FL

Last Updated 04/29/2021 08:09 AM
Project Title

Rio West Force Main Extension

Physical Address View project details and contacts
City, State (County) Rio, Stuart, FL 34996   (Martin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $562,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Extension of small diameter sewage collection force mains for adjacent to approximately 281 homes along NE Alice Street, and south of NE Dixie east to NE Rio Pine Lane. Bid to include alternate bid item to install a portion of the needed long and short side service laterals and main taps for a portion of the homes. The Contractor will need to furnish all equipment, materials, labor, and supervision necessary to complete the force main extension project by open cut and directional drill.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents