Similar Projects
Woodfield Area Apartments
New Construction, Addition
Conception
$90,000,000 est. value
Schaumburg, IL 60168

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Downtown Towers
New Construction, Demolition - 41,000 SF
Design
$350,000,000 est. value
Chicago, IL 60605

1300 Carroll - Phase 1
LEED Certification, New Construction, Infrastructure - 787,807 SF
Bidding
$155,000,000 CJ est. value
Chicago, IL 60607

Cassidy Place Mixed Use
New Construction
Post-Bid
$139,000,000 est. value
Chicago, IL 60654

The Obama Presidential Center - Bid Packages 8.24.21
New Construction - 5,000 SF
Post-Bid
$13,950,000 to $20,433,000 est. value
Chicago, IL 60637

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

Administration Headquarters, Fieldhouse and Site Development
New Construction - 74,000 SF
Construction
Chicago, IL 60611

1000M Mixed Use Development
New Construction - 50,000 SF
Construction
$470,000,000 est. value
Chicago, IL 60605

Higgins Road Redevelopment
New Construction, Demolition
Pending Verification
$2,390,000 est. value
Hoffman Estates, IL 60169

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

London Crossing
New Construction, Infrastructure - 32,600 SF
Design
$11,000,000 CJ est. value
Wheeling, IL 60090

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Mid-West Regional Construction IDIQ MATOC
Results
$50,000 to $80,000,000 est. value

Last Updated 01/03/2023 12:31 PM
Project Title

New Headquarters and Garage at Salt Creek Landscape Maintenance

Physical Address View project details and contacts
City, State (County) North Riverside, IL 60546   (Cook County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Parking Garage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 3, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Notice is hereby given that the Forest Preserve District of Cook County (the District) is soliciting Bids for the above referenced project. The work includes, but is not limited to, demolition, construction of new HQ & Garage building, site improvements and renovation to existing buildings at the Salt Creek Landscape Maintenance site, and other related work as specified in the plans & specifications. During the bid process, all inquiries must be directed in writing and emailed to the Districts Purchasing Agent as follows: Email: fpd.purchasing@cookcountyil.gov All questions must be received in writing by 5:00 p.m. Tuesday, September 27, 2022. The District seeks the following participation goals with respect to Minority-owned Business Enterprises (MBE) and Women-owned Business Enterprises (WBE) for this project: 24 % MBE participation goal and a 10 % WBE participation goal Inspection window closes at 12:00 Noon and there is no other opportunity for this inspection. This determination is based upon the scope of work, estimated project cost and the availability of certified MBEs and WBEs that are certified to provide the type of work needed to successfully complete this project. Collectively, MBEs and WBEs shall be deemed MBE/WBEs. Submission of a Certificate of Intent to Comply with the Cook County Resident Employment is required for all construction projects over $100,000. Work shall be substantially completed within 360 calendar days from date that the District issues the Notice To Proceed. Substantial completion is the stage in the progress of the Work, as defined in the General Conditions, or a designated portion thereof, that is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. Liquated damages clause in Section GC-4(g) is applicable to the Work. The Contract shall end within 90 calendar days from the Substantial Completion date. When required, the bid shall be accompanied by a surety statement from a qualified Surety Agency indicating bidder's ability to obtain valid and enforceable Performance Bond and Payment Bond in the full amount of the bid, should the Contract be awarded to the Bidder. The actual bond shall be provided within fourteen (14) days of the notice of award. (Note: Refer to "IB-10. Bid Security - Section C" for Bond Rating and Financial Size Category requirements). Project No.: 19111047, 20-80-50

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents