Similar Projects
Wastewater Rehabilitation - East Mesa Water Reclamation Facility - City of Las Cruces
Renovation
Conception
Less than $500,000 est. value
Las Cruces, NM 88011

Collections and Storm Water PLC Upgrade
Renovation
Bidding
$200,000 CJ est. value
Albuquerque, NM 87102

Big Mesa MDWCA Dedicated Fill Line
Renovation
Post-Bid
Conchas, NM

WWTP Main Plant Structure No. 2
New Construction
Post-Bid
$5,600,000 to $5,900,000 est. value
Bosque Farms, NM 87068

UV Disinfection Channel Rehabilitation
New Construction
Results
Bosque Farms, NM 87068

Wastewater Treatment Plant Improvements
Renovation
Results
Less than $1,900,000 est. value
Springer, NM

RFP Engineering - Southside Water Reclamation Plant (Swrp) Outfall Restoration Project Design
Infrastructure
Pending Verification
$4,994,567 CJ est. value
Albuquerque, NM 87105

Mesita Lagoon
Addition
Post-Bid
Laguna, NM

Rehabilitate Wastewater Lagoon 2
New Construction
Results
Clayton, NM

Water And Wastewater Facilities Maintenance And Repair
Term Contract
Post-Bid
Gallup, NM

Edgewood Wastewater Treatment Plant Improvements Package 2
Renovation
Results
$962,299 est. value
Edgewood, NM 87015

Wastewater Treatment Plant Expansion 2021
New Construction, Addition - 14,042 SF
Post-Bid
$7,200,000 est. value
Anthony, NM

South Central Wastewater Treatment Plant Improvements
Renovation
Results
$3,000,000 est. value
La Mesa, Las Cruces, NM 88044

Grit Chamber Support Replacement
Renovation
Post-Bid
Hobbs, NM

JHWWTF Ultraviolet Disinfection System Installation and Improvements
Renovation
Results
Las Cruces, NM

Last Updated 10/03/2022 02:04 PM
Project Title

South Central WWTP Improvements Phase 3

Physical Address View project details and contacts
City, State (County) La Mesa, NM 88044   (Dona Ana County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,501,948 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The project consists of improvements to the treatment plant effluent outfall, including installation of a new UV disinfection system with a new metal fabricated platform and shade canopy; installation of a new low profile cascade aerator with metal fabricated shade structure; installation of flow metering equipment and yard piping; and site demolition of existing equipment and yard piping. Bids are requested for the following Contract: Dona Ana County South Central WWTP Improvements Phase 3 Owner anticipates that the Project's total base bid price will be approximately $2,040,600.00 The Project has an expected duration of 270 days. Obtaining the Bidding Documents Information and Bidding Documents for the Project can be found at the following designated website: https://bhitracker.bhinc.com Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. For bidding forms, and Contract Documents, including plans, specifications, and other documents to be used in connection with the submission of bids, prospective Select the pertinent project as listed on the projects list. Register new company account by providing the following contact information: Company name, contact name, company role, telephone number and email address. The Bidder shall receive a notification email once the bidder has been registered with the site. Each registered bidder will be able to re-access the site from www.bhinc.com and selecting the "BHITracker(R)/Bids" icon which will direct the Bidder to the BHITracker(R) bid document distribution site. The Bidder shall have a specific username and password in order to gain access to the "DAC South Central WWTP Improvements Ph3" project. If you do not or cannot access the site, please notify us as soon as possible. The following shall be performed through the BHITracker(R) site. 1. DOWNLOAD THE BIDDING DOCUMENTS FROM THE BHITRACKER(R) SITE: The bidding documents are available during the bidding phase from the CONTRACT DOCUMENTS tab under the BIDDING DOCUMENTS subsection. When issued, addenda will be available from the ADDENDA SECTION. 2. PLEASE SUBMIT ALL QUESTIONS THROUGH THE BHITRACKER(R) SITE: To submit a question, go to the BIDDING tab and click on SUBMIT QUESTION. This will direct you to a form to enter the question, when complete click SUBMIT and the question will be sent to BHI for review. Responses to questions will be included in the Addenda section (under the CONTRACT DOCUMENTS tab) and bidders will be notified via email when this information is available. 3. The bidders list is provided in the BIDDERS LIST tab. 4. Electronic bid submission - instructions will be available on the BHITracker website Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents