Similar Projects
City and County Building Interior Earthquake Damage Repairs
Renovation
Bidding
$2,000,000 CJ est. value
Salt Lake City, UT 84101

Millard School District Sitework Improvements 2023
Infrastructure - 8,000 SF
Bidding
$440,000 CJ est. value
Delta, UT 84624

2022 Concrete Replacement
Alteration
Post-Bid
$813,991 est. value
Bountiful, UT

Storm Water Prevention - Phase One, East High School
Infrastructure
Post-Bid
Salt Lake City, UT 84102

SLCC Jordan Quad Concrete Replacement
Alteration
Results
$55,000 est. value
West Jordan, UT 84088

Oquirrh Park
Alteration
Results
$45,000 est. value
Riverton, UT 84065

Precast Collector Wall Replacement
Infrastructure
Post-Bid
$215,000 CJ est. value
South Jordan, UT 84095

2022-2027 Midvale City Concrete Repairs
Term Contract
Results
Midvale, UT

Murray Theater Renovation
Renovation
Post-Bid
$380,000 CJ est. value
Murray, UT 84107

2022 Concrete Replacement
Alteration
Results
South Weber, UT

Brinkerhoff and Hobbs LLC Project
Build-out
Post-Bid
$1,800,000 CJ est. value
Price, UT 84501

2022 Miscellaneous Concrete Projects
Alteration
Results
Sandy, UT

Rock Canyon Aquifer Storage Booster Station
New Construction, Infrastructure
Post-Bid
$12,987,039 CJ est. value
Provo, UT 84601

DFCM Construction Pre-Qualified General - DWS Cedar City Building Concrete Replace
Infrastructure
Results
Cedar City, UT 84720

Tennis Court Fencing and Concrete Repair
Alteration
Post-Bid
$110,000 est. value
Rush Valley, UT 84069

Last Updated 05/03/2023 12:09 PM
Project Title

Construct South Apron and Taxiway Connector

Physical Address View project details and contacts
City, State (County) St George, UT 84790   (Washington County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,955,335 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The BID includes the following: Schedule I - Construct South Apron and Taxiway Connector Construction for this project is expected to take 70 Working Days. The major work involved in the proposed project includes: Excavation, suitable embankment, subbase and base course, cement treated base, asphalt surface course, pavement markings, drainage, electrical conduit and cable, taxiway edge lights, signage, and apron area lights . Bid Conditions. The bidder is required to provide all information as required within the Contract Documents. The bidder is required to bid on all items of every schedule or as otherwise detailed in the Information for Bidders. Bids may be held by the City of St. George for a period not to exceed 45 days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. Bid Bond. The 100% performance - labor and materials bond will be required on this project. Every BID shall be accompanied by a bid bond in the amount of 5% of the bid, naming the City of St. George as obligee. This bid bond must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to the City of St. George. Certificate of Legal Work Status. As required by St. George City Code 1-10B-14 a signed certificate of legal work status for the BIDDER must accompany the BID. City of St. George reserves the right to reject any, or all BIDS, or to waive any formality or technicality in any BID, in the interest of the City. Performance & Payment Bond. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price. DBE Requirement. The requirements of 49 CFR part 26 apply to this contract. It is the policy of the City of St. George to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. The Owner encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. The St. George Regional Airport has a DBE participation goal to be obtained through race/gender-neutral means of 1.98%. Contractor shall provide a certified statement signed by the subcontractors, indicating actual amounts paid to the Disadvantaged Business Enterprise (DBE) subcontractors and/or suppliers that were used on the project through race neutral means. Goals for minority participation for each trade: 12.6%% Goals for female participation in each trade: 6.9% Questions concerning information in the BID package should be directed to: Mary Wahl, Purchasing Manager City of St. George 175 East 200 North St. George, Utah 84770 Phone: (435) 627-4717 E-mail: mary.wahl@sgcity.org Or to: Kirt McDaniel, Project Manager Jviation, a Woolpert Company 35 South 400 West, Suite 200 St. George, Utah 84770 Phone: (435) 574-5308 E-mail: kirt.mcdaniel@woolpert.com Technical questions regarding the bidding documents shall be directed to Kirt McDaniel with Jviation, a Woolpert Company, 35 South 400 West, Suite 200, St. George, Utah 84770, (435)574- 5308, Fax: (435)673-8484, or email kirt.mcdaniel@woolpert.com.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents