Similar Projects
2021 Curb Replacement
Infrastructure
Post-Bid
Pleasant Hill, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

163rd Street Improvements
Results
Pleasant Hill, MO 64080

Johnston Drive Sidewalk
Alteration
Results
Raymore, MO

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Combination Project for Hargis Lake Sanitary Sewer, Stormwater Sewer and Water Line Relocation
Infrastructure
Results
Belton, MO 64012

Muddy Creek Regional Stormwater Detention Basin
Infrastructure
Post-Bid
Harrisonville, MO

Resurface on Route A and Route B
Infrastructure
Results
$15,000,000 to $20,000,000 est. value

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value
Harrisonville, Platte City, MO

Intersection Improvements and Resurfacing
Infrastructure
Results
MO

2022 Parking Lot Improvements
Infrastructure
Post-Bid
$200,000 est. value
Belton, MO

Resurface from 163rd Street
Infrastructure
Results
$7,500,000 to $10,000,000 est. value
MO

FY 23 Street Preservation Project
Infrastructure
Post-Bid
Belton, MO

Playground and Pavement Upgrades
Renovation, Infrastructure
Results
Raymore, MO 64083

Cass County Justice Center Parking Lot Improvements
Infrastructure
Results
Harrisonville, MO 64701

Reported 05/27/2022 12:00 AM
Project Title

2022 Street Overlay, Curb Replacement, Storm Sewer Project

Physical Address View project details and contacts
City, State (County) Raymore, MO   (Cass County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Utility Street Construction and Excavation, Sidewalks/Curbs/Gutters, Stormwater Improvements, Street/Road Repairs Description: STREET OVERLAY Two of the streets, Heritage and Calico, have storm sewer crossings and curb to be removed and replaced prior to being milled and overlaid. 58950 sq yds of full width milling 6645 tons of 2" Type 3 Recycled overlay Tack oil is to be UltraTack, Trackless Tack NTSS-1HM manufactured by Blacklidge applied at the residual rate of .06 gal/sq yd, CAT-TAC trackless tack manufactured by Hunt Refining applied at the same rate, or other approved trackless tack oil. Paving will not begin until the tack has broken. Milled surface is to be cleaned by a vacuum sweeper immediately prior to tacking. 1597 tons of full depth patching, Type 1 Recycled asphalt. 2000 linear feet of deep crack repair on 18 streets. 10000 pounds of crack seal on two thoroughfares prior to micro surface 34980 sq yards of Type II micro surface on two thoroughfare streets; Foxridge and Lucy Webb. Re-striping two thoroughfare streets after micro surfacing. See map for specific streets. Install two, Paveway Systems, brick pattern crosswalks with 6" wide, white, thermoplastic borders. Asphalt is to be milled and overlaid 50 feet either side of the center of the crosswalks prior to the crosswalk being installed. See the crosswalk on Municipal Circle at Centerview as an example. Provide traffic control that meets MUTCD standards for all phases of the project. CURB REPLACEMENT 18000 linear feet curb removal and replacement with modified high back and roll back curb. 15 surface mount detectable warning tiles for ADA ramps. 8 ADA ramps 1000 square feet of sidewalk replacement STORM SEWER Remove and replace 11 sections of storm sewer crossing two streets (Calico and Heritage) along with the adjacent curb inlets/junction boxes.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents