Project Title

Drainage Ditch Maintenance

Physical Address View project details and contacts
City, State (County) IL   (Lawrence County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of silt, installation of riprap, spreading of silt and seeding of banks and cleaning of culverts. Separate Bid Packages Section A A @ includes Allison Ditch No. 1, Allison No. 1 Outlet Ditch, Russellville Ditch and Taylor Ditch. This section is 20.095 miles in length and will have 120 working days to complete the work. Section A B @ includes Allison Ditch No. 2, Allison Ditch No. 3 and Westport Ditch. This section is 18.898 miles in length and will have 120 working days to complete the work. Section A C @ includes Beaver Pond Ditch, Beaver Pond Outlet Ditch and Otter Pond Ditch. This section is 15.464 miles in length and will have 100 working days to complete the work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents