Similar Projects
Summit County Fairgrounds - Phase IA
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Coalville, UT 84017

Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Quinns Water Treatment Plant and Signal Hill Area
New Construction, Infrastructure
Design
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

Francis City - 2023 CDBG Culinary Water Improvements
Infrastructure
Bidding
$1,500,000 CJ est. value
Francis, UT 84036

Francis City - 2023 CDBG Culinary Water Improvements
Infrastructure
Bidding
$1,500,000 CJ est. value
Francis, UT 84036

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Rossi Hill Reconstruction Project
Infrastructure
Results
Park City, UT

I-80; MP 167.69 - 178.75, Roadside Improvements
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
UT

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

RFP - Highway 40 Corridor Spatial Study
Term Contract
Conception
Coalville, UT 84017

Mountainside Storage
New Construction, Infrastructure - 174,330 SF
Design
$18,900,000 CJ est. value
Kamas, UT 84036

Summit County 2022 Overlay Project
Infrastructure
Post-Bid
$4,528,024 CJ est. value
Coalville, UT 84017

Last Updated 07/18/2023 11:41 AM
Project Title

2023 City Wide Road Improvements

Physical Address View project details and contacts
City, State (County) Hideout, UT 84036   (Summit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Paving service including highway paving and road paving and infrastructure building services and parking lot and surfacing services Heavy construction machinery and equipment including equipment for paving and earth moving. Roads and landscape material including asphalts and road and railroad construction materials and soil stabilizers and artificial turf and construction aggregates including rock, gravel, and sand Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation. Question Deadline 08/02/2023 at 5:00 PM MT The final completion date for the contractor to complete this project will be October 15th, 2023. Bid security in the form of a certified check, cashier's check or bid bond in the amount of five percent (5%) of the bid shall accompany each proposal. The bid bond will be forfeited if the bidder is awarded the Contract and fails to enter into a Contract with the Owner. Town of Hideout reserves the right to reject any or all bids, waive any informality in a bid or to withhold the Award for any reason Town of Hideout determines.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Earthwork Methods, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents