Similar Projects
2019 City Hall Renovation
Renovation
Construction
Less than $3,100,000 est. value
Lebanon, NH

Request for Proposals for Construction Services
New Construction, Renovation - 30,000 SF
Post-Bid
$5,000,000 est. value
Bedford, NH

NH Rudman Building Design Standards
Renovation, Term Contract
Post-Bid
Concord, NH 03301

Dunbarton Town Hall Addition
Addition
Results
Dunbarton, NH

New Town Hall Construction
New Construction
Design
Salem, Salisbury, NH

New Town Hall Construction
New Construction
Design
Salem, Salisbury, NH

RFQ - Owners Project Manager
Renovation
Results
Salem, NH 03079

Town Hall Annex Renovation
Renovation
Post-Bid
Rye, NH 03870

City Hall Campus Renovation
Renovation
Post-Bid
Concord, NH 03301

Last Updated 06/09/2022 07:32 AM
Project Title

Dover City Hall Clock Tower Restoration

Physical Address View project details and contacts
City, State (County) Dover, NH 03820   (Strafford County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work 1. Identify and repair locations of water intrusions including, but not limited to: Gold leaf dome Copper roofing Metal sheeting Clock faces 2. Replace, repair and re-secure wooden blockings throughout base of dome as some are missing and or will need to be repositioned or re-secured. 3. Scrape steel shaft cross bracing free of all loose debris. Steal shaft and cross bracing shall be repaired or replaced as necessary. Apply one full prime coat of Rustoleum primer, two full coasts of Rustoleum black satin to all steel bracing at this level. 4. Repair / replace louvers that are missing at bell tower level. 5. Evaluate wiring within bell / clock tower; ensure all installation is code compliant. (Coordinate with Inspection Services) 6. Install one outlet below each of the six windows at lower level of clock tower. 7. Remove 100% of the wooden bead board ceiling above bell and replace with new water proof to match appearance as closely to original boards. 8. Scrape and sand exterior dome including weather vane, components and finial. Clean all loose debris. Re-solder weather vane, components and dome joints where needed. Apply (1) prime coat Rustoleum black primer to all black metal components. Apply two full coats of yellow enamel to components which have gold leaf applied, apply 23 karat gold leaf to all yellow components. Gold leaf shall carry a 25-30 year life expectancy. 9. Repair clock hands and mechanism as needed. 10. Replace clock glass on clock face on front of the building, all glass panels shall have a consistent color and clarity. 11. Replace roof access door at lower level of clock tower, with an exterior steel door. 12. Scrape/paint exterior of windows, re-glaze if needed, and paint all wood surfaces of the window. Paint color to be determined by owner. 13. Scrape and paint all exterior surfaces that were formerly painted white, paint color to be determined by owner.

Details

Capitol/Court House/City Hall, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents