Similar Projects
Last Updated | 06/09/2022 07:32 AM |
Project Title | Dover City Hall Clock Tower Restoration |
Physical Address | View project details and contacts |
City, State (County) | Dover, NH 03820 (Strafford County) |
Category(s) | Government/Public |
Sub-Category(s) | Capitol/Court House/City Hall |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work 1. Identify and repair locations of water intrusions including, but not limited to: Gold leaf dome Copper roofing Metal sheeting Clock faces 2. Replace, repair and re-secure wooden blockings throughout base of dome as some are missing and or will need to be repositioned or re-secured. 3. Scrape steel shaft cross bracing free of all loose debris. Steal shaft and cross bracing shall be repaired or replaced as necessary. Apply one full prime coat of Rustoleum primer, two full coasts of Rustoleum black satin to all steel bracing at this level. 4. Repair / replace louvers that are missing at bell tower level. 5. Evaluate wiring within bell / clock tower; ensure all installation is code compliant. (Coordinate with Inspection Services) 6. Install one outlet below each of the six windows at lower level of clock tower. 7. Remove 100% of the wooden bead board ceiling above bell and replace with new water proof to match appearance as closely to original boards. 8. Scrape and sand exterior dome including weather vane, components and finial. Clean all loose debris. Re-solder weather vane, components and dome joints where needed. Apply (1) prime coat Rustoleum black primer to all black metal components. Apply two full coats of yellow enamel to components which have gold leaf applied, apply 23 karat gold leaf to all yellow components. Gold leaf shall carry a 25-30 year life expectancy. 9. Repair clock hands and mechanism as needed. 10. Replace clock glass on clock face on front of the building, all glass panels shall have a consistent color and clarity. 11. Replace roof access door at lower level of clock tower, with an exterior steel door. 12. Scrape/paint exterior of windows, re-glaze if needed, and paint all wood surfaces of the window. Paint color to be determined by owner. 13. Scrape and paint all exterior surfaces that were formerly painted white, paint color to be determined by owner. |
||||||||||||||||||||||||||||||||||||
Details | Capitol/Court House/City Hall, Renovation.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |