Similar Projects
Last Updated | 04/13/2022 08:03 AM |
Project Title | FY2021 Road Resurfacing Project - Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Union City, NJ 07087 (Hudson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of one base bid of improvements to the following roads: 14th Street (from Speedbump at #311 to Speedbump at #321) Bergenline Avenue (from 17th Street to Speedbump at #1707) 36th Street (from Speedbump at #614 to John F. Kennedy Boulevard) Pothole repairs at various locations The project also consists of one alternate bid of improvements to the following roads: Intersection of 10th Street & New York Avenue New York Avenue (from 2nd Street to 3rd Street) 7th Street (from New York Avenue to Bergenline Avenue) West Street (from Speedbump at #2306 to Speedbump at #2312) Pothole repairs on New York Avenue More specifically, work shall include traffic control, HMA milling, paving, base repair (as required) and traffic markings. An allocation for base repair is included, which may be required for trench areas that have settled or other areas where it is deemed necessary by the Engineer once milling is performed. Additionally, the project consists of miscellaneous pothole repairs throughout the City if and when/where directed (see Appendix 'B'). Work shall include the saw-cutting and removal of pavement and base material in and around the identified pothole and/or deteriorated roadway section, full depth pavement repair, repair joint sealing, infrared repair (if necessary and directed) and restoration of roadway features including striping, markings, etc. Pothole repair activities shall take place once a month as coordinated with the City's Engineer, and the duration shall be as long as necessary to complete all repairs identified by the City's Engineer. Schedule of repairs are subject to vary depending on necessity. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |