Similar Projects
Asphalt Paving At 8 LNA Sites
Term Contract
Bidding

Atlantic City Expressway Heavy Highway Job Order Contract
Term Contract
Bidding

2020 Miscellaneous City-Wide Pothole Repair - Phase 3
Post-Bid
Union City, NJ

2020 CDBG Road Reconstruction Program
Post-Bid
Old Bridge, NJ

FY 2018 Meadowlands Parkway Rehabilitation
Results
Secaucus, NJ 07094

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Secaucus Road Preservation
Post-Bid
Secaucus, NJ

Central Avenue Streetscape Roadway Improvements
Results
Jersey City, NJ 07307

Bituminous Concrete Resurfacing - As Needed
Post-Bid
Jersey City, NJ

2020 Mill/Overlay Program
Results
Secaucus, NJ 07094

2019 NJDOT Roadway Preservation Various Street
Post-Bid
Hoboken, NJ

Roadway Resurfacing Milepost 0 to 122; (2020)
Results
$880,000 est. value

Asphalt and Miscellaneous Works
Alteration
Post-Bid
North Bergen, NJ

2020 Road Program 6th Street
Results
Secaucus, NJ 07094

Peter Street Extension
Infrastructure
Post-Bid
Union City, NJ 07087

Last Updated 04/13/2022 08:03 AM
Project Title

FY2021 Road Resurfacing Project - Phase 2

Physical Address View project details and contacts
City, State (County) Union City, NJ 07087   (Hudson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of one base bid of improvements to the following roads: 14th Street (from Speedbump at #311 to Speedbump at #321) Bergenline Avenue (from 17th Street to Speedbump at #1707) 36th Street (from Speedbump at #614 to John F. Kennedy Boulevard) Pothole repairs at various locations The project also consists of one alternate bid of improvements to the following roads: Intersection of 10th Street & New York Avenue New York Avenue (from 2nd Street to 3rd Street) 7th Street (from New York Avenue to Bergenline Avenue) West Street (from Speedbump at #2306 to Speedbump at #2312) Pothole repairs on New York Avenue More specifically, work shall include traffic control, HMA milling, paving, base repair (as required) and traffic markings. An allocation for base repair is included, which may be required for trench areas that have settled or other areas where it is deemed necessary by the Engineer once milling is performed. Additionally, the project consists of miscellaneous pothole repairs throughout the City if and when/where directed (see Appendix 'B'). Work shall include the saw-cutting and removal of pavement and base material in and around the identified pothole and/or deteriorated roadway section, full depth pavement repair, repair joint sealing, infrared repair (if necessary and directed) and restoration of roadway features including striping, markings, etc. Pothole repair activities shall take place once a month as coordinated with the City's Engineer, and the duration shall be as long as necessary to complete all repairs identified by the City's Engineer. Schedule of repairs are subject to vary depending on necessity.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents