Reported 01/17/2019 02:29 AM
Project Title

Windy Hill Boulevard Project

Physical Address View project details and contacts
City, State (County) Smyrna, GA   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Widening and reconstructing the existing 5-lane roadway between South Cobb Drive and Atlanta Road. The proposed roadway will include four express lanes to facilitate east/west through traffic; 1-lane frontage roads in each direction to accommodate local traffic; bicycle lanes; and pedestrian trails. The project will also include two bridges strategically placed to provide local vehicular and pedestrian traffic the ability to traverse the express lanes. Estimated larger material quantities in this project include: 1. 44,000 TN Graded Aggregate Base 2. 27,000 TN Asphalt Paving 3. 9,300 LF Concrete Storm Pipe 4. 3,200 LF Concrete Median Barrier 5. 3,400 LF Traffic Barrier H 6. 77,000 SF Soil Nail Walls 7. 37,000 SF Bridge Decking 8. 120,000 CY Excavation (Waste)
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents