Similar Projects
2023 Asphalt Program
Infrastructure
Bidding
$305,000 CJ est. value
Solon, OH 44139

Concrete Repair Products
Alteration
Post-Bid
Cleveland, OH

Olmsted Falls 2022 Concrete Program
Infrastructure
Post-Bid
$200,000 est. value
Olmsted Falls, OH

Water Reclamation Facility Concrete Repairs
Alteration
Results
$3,600,000 est. value
Cleveland, OH 44139

Annual Concrete Repair Program
Alteration
Results
Solon, OH

2022 Sidewalk Program
Infrastructure
Post-Bid
$183,250 CJ est. value
Mayfield Heights, OH 44124

2022 Road Program - Concrete Repairs
Alteration
Results
Brecksville, OH

Hawthorn Parkway Bridge Replacement at South Chagrin Reservation
Demolition, New Construction, Infrastructure
Post-Bid
$2,015,785 CJ est. value
Solon, OH 44139

2022 Road Program - Unscheduled Concrete Repairs
Alteration
Results
Brecksville, OH

Asphalt Concrete Surface
Term Contract
Post-Bid
Cleveland, OH 44114

2022 Road Program - Partial Depth Repairs, Concrete
Alteration
Results
Brecksville, OH

Concrete
Term Contract
Post-Bid
Cleveland, OH 44115

2022 Concrete Program
Alteration
Results
$200,000 est. value
Lyndhurst, OH

Boston Road (C.r. 127) Rehabilitation of Existing Bridge 07.45
Infrastructure
Post-Bid
$1,400,000 CJ est. value
Broadview Heights, OH 44147

2022 Concrete Program
Alteration
Results
$400,000 est. value
Pepper Pike, OH

Last Updated 05/03/2023 10:39 AM
Project Title

Bradstreet's Landing Waterfront Improvements, Phase 2

Physical Address View project details and contacts
City, State (County) Rocky River, OH 44116   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,802,144 [brand] Estimate
Plans Available from Copy Center - 02/15/23
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 3, 2023, project was awarded to Precision Engineering & Contracting, Inc. awarded amount is $3,802,144.07. Work will include construction of a new 40-foot-long bridge over Spencer Creek, a new 115-foot-long waterfront boardwalk, approximately 90 feet of stepped waterfront revetment along the Lake Erie shoreline, approximately 60 feet of armor stone revetment, and upland work including a vehicular turnaround circle, concrete plaza, rain garden, lighting, and appurtenant utilities. Two additive alternate bids will also be received for (1) construction of a 600-foot-long driveway/parking lot extending from the vehicular turnaround to Lake Road, and (2) construction of gateway walks and landscaping. Each proposal must contain the full name of party or parties submitting the proposal and all persons interested in same and be accompanied by a bid guaranty in the form of either a Bond in an amount equal to one-hundred percent (100%) of the total bid drawn in favor of the City of Rocky River, or a consent of surety together with a certified or cashier's check or letter of credit on a solvent bank in Cuyahoga County made payable to the City of Rocky River in an amount not less than ten percent (10%) of the total amount of the bid as prescribed in Ohio Revised Code Section 153.54. Each bidder must submit evidence of its experiences on projects of similar size and complexity.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents