Similar Projects
Building Inspections and Customer Utility Services Counters Project
Bidding
Plano, TX

Y1da--674A4-21-001 Create Seclusion Rooms B94 (Padding)
Bidding
$25,000 to $100,000 est. value
Waco, TX 76711

Clear Creek ISD Package 3 Vestibule Upgrades Project
Post-Bid
Columbus, TX

Drinking Fountain Replacement
Post-Bid
Less than $450,000 est. value
TX

Anti-Ligature Related Facility Alterations - at Rusk State Hospital
Renovation
Results
$4,800,741 est. value
Rusk, TX 75785

Gray Hall Vivarium Restoration
Results
Less than $909,000 est. value
Houston, TX 77004

Van Horn Wall Finishing
Bidding
Austin, TX 78773

Bath House Cultural Center Selected Interior Rehabilitation and Site Improvements
Post-Bid
Dallas, TX 75218

Design, Material and Installation of Acoustic Panels
Results
Less than $52,039 est. value
Abilene, TX 79602

Y1dz--Install and Provide Two Each 60` Flagpoles
Bidding
$25,000 est. value
Amarillo, TX 79106

Hill County Covington Street Annex Facade and Interior Renovations
Renovation
Post-Bid
Hillsboro, TX 76645

Rusk State Hospital Ceiling Tile Replacement
Results
$60,000 est. value
Rusk, TX 75785

Residential Renovations
Bidding
Tyler, TX

Walls and Finish - New Weight Room
Post-Bid
Kemp, TX 75143

Drywall Services
Results
Less than $150,000 est. value
Round Rock, TX 78664

Last Updated 12/17/2020 12:54 PM
Project Title

Sockwell Center Operable Partitions

Physical Address View project details and contacts
City, State (County) Plano, TX 75093   (Collin County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing operable partitions, demolition of adjacent drywall and ceiling work to accommodate installation of new electrically operated partition systems, repair of drywall head furr-down and partition pockets to accommodate installation of new partition systems, electrical and control work required to operate the partition system, and texturing, bedding and painting of drywall repairs and modifications. 1. All existing partitions, track and track supporting elements shall be removed from the project site. 2. All new elements required to structurally support the new electrically operated partition system shall be furnished and installed as required to provide a fully operational system upon completion. Contractor shall be responsible for drilling/punching holes in existing structural support system to properly support the new operable partition track in accordance with partition system manufacturer’s guidelines. 3. Partitions controls shall be operated by keyed switches capable of accommodating removable cores and able to receive Falcon F1/F2 keyway.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents