Similar Projects
2022 Bond - New Municipal Court Building - City of Little Rock
New Construction
Conception
$7,000,000 est. value
Little Rock, AR

Bankruptcy Historic Courthouse Repair
Renovation
Design
$1,000,000 CJ est. value
Little Rock, AR 72201

Bowman Road Widening - City of Little Rock
Infrastructure
Design
$4,000,000 CJ est. value
Little Rock, AR 72211

Central Utility Plant Drainage Relocation
Infrastructure
Bidding
$11,067,000 CJ est. value
Little Rock, AR 72202

The East End 2021 Water Improvements Contract - 2 Water Line Improvements
Infrastructure
Post-Bid
North Little Rock, AR 72100

Installation of 12inch Diameter Ductile Iron Pipe Crossing I-40 Harris Road
Infrastructure
Post-Bid
Little Rock, AR 72223

Gymnasium Basketball Court Resurfacing
Renovation
Results
$6,500 est. value
Little Rock, AR 72202

2" Galvanized Water Main Replacements
Infrastructure
Results
$2,000,000 est. value
North Little Rock, AR

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Tulip Farms 16 Inch Main Extension Project
Infrastructure
Construction
$803,104 CJ est. value
Little Rock, AR 72201

New Park Downtown - City Of Little Rock
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Little Rock, AR 72201

Residential New Construction Project
New Construction, Infrastructure - 1,200 SF
Pending Verification
$330,000 CJ est. value
North Little Rock, AR 72114

Little Rock AFB Civil Works Contract
Term Contract
Design
$10,000,000 CJ est. value
LrAFB, AR 72099

Bldg. 65 Sanitary Sewer Line
Term Contract
Post-Bid
North Little Rock, AR 72114

Gill Street Bridge and Episcopal Collegiate School 16" Potable Water Main Relocation Phase 2 - 2022
Renovation, Infrastructure
Results
$929,359 est. value
Little Rock, AR

Last Updated 06/30/2023 02:12 PM
Project Title

New District Courts Facility - 2022 Bond - City of Little Rock

Physical Address View project details and contacts
City, State (County) Little Rock, AR 72201   (Pulaski County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Capitol/Court House/City Hall, Maintenance, Park/Playground, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $8,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

$8.5 million on a new district courts facility As of June 30, 2023, this project is part of a $161,800,000 bond that was passed and approved by the voters at the special election on August 9, 2022. Information regarding a design team or a general contractor is not available. A timeline for construction has not been determined.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents