Similar Projects
Patterson Road Sidewalk
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29209

US 76 over US 601
Demolition, New Construction, Infrastructure
Conception
$9,648,000 CJ est. value
Columbia, SC 29205

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Blythewood Road Widening Project
Infrastructure
Bidding
$500,000 CJ est. value
Columbia, SC 29201

Jackson Creek Site Restoration Project
Infrastructure
Post-Bid
Columbia, SC 29206

Stone Pavillion Chilled Water Line Replacement
Infrastructure
Post-Bid
$300,000 to $400,000 est. value
Columbia, SC 29203

Statewide Campground Utility Upgrades-Sesquicentennial State Park
Results
Columbia, SC 29223

USC Jones PSC Fire Line Relocation
Infrastructure
Results
$50,000 to $80,000 est. value
Columbia, SC 29201

Clutch Coffee / Columbia
New Construction, Infrastructure - 798 SF
Construction
$250,000 CJ est. value
Columbia, SC 29209

Finlay Park Development
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Columbia, SC 29201

Colony Northpointe Recreation Project (Design Engineering for Bridge)
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Columbia, SC 29201

US 76 Safety Improvements in Richland County
Infrastructure
Conception
$10,204,000 CJ est. value
Columbia, SC 29205

Sidewalk Package S11 Polo Road and Harrison Road Sidewalks
Infrastructure
Design
$4,672,637 CJ est. value
Columbia, SC 29206

Last Updated 12/07/2022 11:54 AM
Project Title

West Columbia 42 Inch Sewer Main Protection Riverwalk Project (SS7559) CDBE Part II

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $407,748 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Awardee: Stutts & Williams, LLC for $407,748.85 For West Columbia 42 Inch Sewer Main Protection Riverwalk Project (SS7559) CDBE This project has been designated as a City of Columbia Disadvantaged Business Enterprise Program Project with a CDBE goal established at 11%.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents