Last Updated | 07/24/2023 03:09 PM |
Project Title | KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma |
Physical Address | View project details and contacts |
City, State (County) | Oklahoma City, OK 73145 (Oklahoma County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $148,925,456 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 26, 2023, the awarded General Contractor requests sub bids for: Overhead Coiling Doors and Storefronts only. Updated project documents are forthcoming. Construction has commenced, today June 26, 2023. This requirement will be solicited as a design-build, 2-phase unrestricted procurement. The magnitude of this construction project is from $100 million to $250 million dollars with an estimated performance period of 913 calendar days. The project is to design and construct a high-bay depot maintenance hangar for the KC-46A Pegasus Aerial Refueling Aircraft. The facility consists of three hangar docks sized to enclose the KC-46A aircraft and required clearances. The hangar bays will accommodate the aircraft in both nose-in and tail-in configuration. Overhead cranes and fall protection will be integrated into this facility. Included within the facility are plant equipment maintenance support and associated back shops, administrative and facility support spaces including program management office spaces. It also includes clearing and grading of the site, storm drainage, aircraft parking apron, aircraft hangar dock access ramps and movement area, utility infrastructure systems, electrical, water, sewer, industrial waste, aircraft fueling system, communications, roads, vehicle parking, curb and gutter, walks and all other supporting facilities Construction is expected to start mid-June 2023. Completion is expected in July 2025. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |