Similar Projects
Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

RFQ Contractors - Insulation and Home Energy Efficient-Related Repair Services
Renovation
Sub-Bidding
$64,000 CJ est. value
Allendale Charter Township, MI 49460

Milliken NC - Walk In Refrigerator Replacement
Renovation
Sub-Bidding
$800,000 CJ est. value
Mackinac Island, MI 49757

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

HVAC Upgrade
Post-Bid
Less than $1,000,000 est. value
Flat Rock, MI

Center Line High School Band and Counseling HVAC Improvements Project
Results
Center Line, MI 48015

Temperature Controls
Results
Attica, MI 48412

Renovations to the Existing Dyno-Exhaust System
Renovation
Sub-Bidding
$100,000 CJ est. value
Alma, MI 48801

Michigan Memorial Phoenix Project Laboratory New Dehumidification Unit in RM 2040 Bidpack 01 - Construction
Alteration
Post-Bid
Ann Arbor, MI 48105

Fulton Street HVAC
Results
Grand Haven, MI 49417

Summer 2023 Work Program - North High School Walk-In Cooler Renovation
Renovation
Sub-Bidding
$300,000 CJ est. value
Grosse Pointe Woods, MI 48236

USCG Sector Sault Ste. Marie A/C Units Replacement
Term Contract
Post-Bid
Sault Sainte Marie, MI

Repair/Refurbish Vilter Ammonia Compressor 450XL
Results
Farmington Hills, MI

Metro North, Oak Park and Metro South, Taylor State Police Post - Boiler Replacement
Renovation
Sub-Bidding
$70,000 CJ est. value
Oak Park, MI 48237

N--USCG Sector Sault Ste. Marie A/C Units Replacement
Term Contract
Post-Bid
Sault Sainte Marie, MI

Last Updated 10/03/2022 03:06 PM
Project Title

Air Quality Improvements

Physical Address View project details and contacts
City, State (County) Buchanan, MI 49107   (Berrien County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

It is the purpose and intent of the Quoting Documents that a fully complete job be accomplished. It shall be each Bidders responsibility to include all costs necessary to provide labor, materials, equipment, and services for that portion of the work bid upon, including but not limited to supervision, shop drawings, samples, tools, scaffolding, lifts, hoists, cranes, taxes, incidentals, whether or not specifically called for in the Quoting Documents Each Subcontractor shall thoroughly examine the existing buildings and sites prior to submitting a quote and include all items necessary to complete their work taking into consideration the existing conditions. Award Contracts November 2022 - Schedule April 2023 thru October 2023 The project schedule provides a narrow window of opportunity to complete a significant amount work. It is the responsibility of the Subcontractor to identify durations as may be required for their scopes of work and insure a timely completion of that scope of work within the scheduled completion date. 1. Heating, ventilating and air conditioning (HVAC) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents