Similar Projects
Jim Simmons Trail Reservoir Trail - State of Ohio
Renovation
Conception
$500,000 est. value
Marysville, OH

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

5th Street Apartments
New Construction
Design
$85,000,000 est. value
Marysville, OH 43040

Jerome Township Fire Station 211
New Construction, Infrastructure - 10,000 SF
Post-Bid
$1,000,000 CJ est. value
Plain City, OH 43064

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Fourth Street Bridge Replacement
Infrastructure, Renovation
Results
$823,255 CJ est. value
Marysville, OH 43040

Pastime Park Sports Court Reconstruction
Renovation
Results
$130,000 est. value
Plain City, OH 43064

Jerome Township Fire Station 211
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Plain City, OH 43064

Honda of Marysville Expansion
Addition, Demolition, Infrastructure, Renovation
Pending Verification
$4,400,000,000 CJ est. value
Marysville, OH 43040

Roadway Minor Rehab
Infrastructure
Design
$6,427,000 CJ est. value
Raymond, OH 43067

Outdoor Improvements - North Union Local Schools
Infrastructure
Post-Bid
$900,000 CJ est. value
Richwood, OH 43344

33 Innovation Park, Phase 3
Infrastructure
Results
$490,909 CJ est. value
Marysville, OH 43040

Connolly Emmaus Road Mixed Use
New Construction, Infrastructure - 15,992 SF
Pending Verification
$5,972,100 CJ est. value
Marysville, OH 43040

Grain Wedding and Event Center
Infrastructure, Renovation
Design
$10,000,000 CJ est. value
Marysville, OH 43040

Reservoir Connector Bridge
New Construction, Infrastructure
Results
$1,240,609 CJ est. value
Marysville, OH 43040

Last Updated 12/13/2022 05:33 PM
Project Title

Vine Street Pocket Park

Physical Address View project details and contacts
City, State (County) Marysville, OH 43040   (Union County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $172,236 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the construction of a new pocket park located on the vacant lot at the corner of 5th Street and Vine Street in Marysville, Ohio. Bidders shall provide proof of qualifications, to perform the Work as described in the Instructions to Bidders, and complete the Best Bidder Information Form provided. Bidders shall comply with all statutory requirements in accordance with the Instructions to Bidders. All Bids must include payment of wages at prevailing wage rates pursuant to Ohio Revised Code (ORC), Section 4115-15 and shall comply with the provisions, duties and obligations of ORC Section 4115. Further information provided in the Instructions to Bidders. Each Bidder must deposit with its Bid, a Bid Guaranty in the form of either a bond for an amount of 100% of the Bid if in the form of a Bid Guaranty or in the amount of not less than ten percent (10%) of the Bid if in the form of a certified check, cashier's check, or irrevocable letter of credit, for and subject to the conditions provided in the Instructions to Bidders and pursuant with ORC Section 153.54, 153.57 and 153.571. Bid security furnished in Bond form shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety or via the electronic bid bond options available portal The project consists of the following work: o Installation of a hardscape plaza including reclaimed bricks and concrete, planter beds, and outdoor seating with screening and decorative fencing along the property line of the site. o Necessary restoration (including curb replacement, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. o Construction Document Plan notes: CIP Concrete Curb shall be 4" for the planter curb and 6" City standard detail for the curb and gutter restoration. Deadline for Contractor Questions (via Bid Express) - Tuesday, December 6 at 4:00 P.M. o The Engineer's Estimate for this project is $606,820. This project entails the extension of sanitary and water along Warner Road and Industrial Parkway. The sanitary sewer will be extended from the east side of the City's Pump Station #2, which is currently under construction and located just north of Kile Ditch. The sewer will run south along the west side of Industrial Drive for approximately 725-feet to Warner Road. The sewer will run along the south side of Warner Road from Industrial Drive for approximately 3,700-feet. The water main will be extended south along Warner Road from the terminus of the existing 12" water main on the north side of the road, which terminates at the west end of the existing Warner Industrial Corporate Center on the north side of Warner Road. The water main will be extended approximately 2,400-feet along Warner Road

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents