Similar Projects
(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Roof Replacement Work 2021
Renovation
Results
Less than $400,000 est. value
Chicago, IL 60638

Health/Life Safety Implementation - HVAC, Flooring, and Ceiling Phase 1
Renovation
Results
Less than $1,500,000 est. value
Collinsville, IL 62234

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Construction
Less than $4,200,000 est. value
Argenta, IL 62501

2021 Classroom Upgrades at the Middle School
Renovation
Post-Bid
Mundelein, IL

Remedial Masonry Repair At Maine West HS
Renovation
Results
Des Plaines, IL 60018

Morton Grove Summer 2021 Roof Replacements
Renovation
Post-Bid
IL 60053

MEP Disney Magnet School
Renovation
Results
$10,000,000 est. value
Chicago, IL 60613

Gymnasium Floor Refinishing
Post-Bid
Decatur, IL 62521

Niles West HS Secure Vestibule & General Work
Renovation
Results
Skokie, IL 60077

2021 Asbestos Abatement At George B Carpenter ES
Post-Bid
Park Ridge, IL 60068

High School Gym Building Refacing & Window Replacement
Renovation
Results
Cerro Gordo, IL 61818

Removal of VAT Flooring and Mastic in Assorted Apartments
Term Contract
Post-Bid
IL

Muffley Elementary School Secure Entry
Results
Decatur, IL 62521

Last Updated 06/16/2022 12:07 AM
Project Title

Abatement and Flooring Replacement

Physical Address View project details and contacts
City, State (County) Steeleville, IL 62288   (Randolph County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Environmental, Flooring, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work covered by the Abatement Base Bid includes the complete removal of approximately 274 SF of carpet flooring glued over VCT flooring with asbestos mastic and approximately 86 LF of wall base via the gross removal method as well as the complete removal of approximately 746 SF of VCT flooring with asbestos mastic and approximately 112 LF of wall base via the heat method at the grade school. At the high school, Work includes the complete removal of approximately 2,000 SF of VCT flooring with asbestos mastic and approximately 183 LF of wall base via the heat method. Work covered by the General Base Bid includes the installation of new owner provided resilient plank flooring and wall base in one space with contractor provided ceramic tile and ceramic wall base in another space over the existing concrete slab-on-grade and wall assemblies at the grade school. At the high school, Work includes the installation of new contractor provided ceramic tile and ceramic wall base over the existing concrete slab-on-grade and wall assemblies.

Details

Elementary School, Renovation, Middle/Senior High School, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Asbestos Remediation, Asbestos Abatement.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents