Similar Projects
New Pond Park
New Construction
Conception
Cumberland, RI 02864

Kingston Park Playground Installation CDBG
Infrastructure
Bidding
Newport, RI

Improvements to River Island Park
Renovation
Post-Bid
$100,000 est. value
Central Falls, RI

City Park Dugout Installations
Renovation
Post-Bid
Warwick, RI 02886

Smithfield High School Tennis Court Repairs - Smithfield School Department
Results
Smithfield, RI 02917

Town Beach Equipment, Installation, Revitalization
Results
North Kingstown, RI 02852

Roger Williams Park Gateway Center
Renovation, Addition - 33,700 SF
Construction
$2,000,000 est. value
Providence, RI 02905

Rocky Point State Park Improvements
Renovation
Post-Bid
Warwick, RI 02886

Tennis and Basketball Court Repairs
Results
Jamestown, RI 02835

Replacement of Herbert F. Paine Memorial Park Tennis Courts
New Construction
Post-Bid
Coventry, RI 02816

Brown Street Park Improvements
Results
Providence, RI 02906

Tennis Courts Cleaning, Crack Seal, and Repainting
Renovation
Post-Bid
Kingston, RI

Joseph Williams Field Playground Improvements
Results
Providence, RI 02907

Restoration of Benedict Memorial Temple of Music
Renovation
Post-Bid
Providence, RI 02907

Ardoene Park Improvements
Results
Providence, RI 02905

Reported 02/24/2022 12:00 AM
Project Title

Riverpoint Baseball Fields

Physical Address View project details and contacts
City, State (County) West Warwick, RI   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Survey and grade set up will. Lay out infield, foul lines, and arc into the outfield to Major League, both infield and outfield Little League regulation. This process includes installing new pitcher's mound, home plate, bases and all base anchors to new elevation and location on both fields. Removal of 1 1/2" grass, thatch and organic material off entire infield, 30' foul lines, and 16' of grass along the perimeter of the outfield. Sod and other discarded materials at an on-site location. All waste debris will then be transported to an off-site location by others. All machines used on the field must be low ground pressure to avoid any damage to existing field and grass areas. Rough grade grass areas with low ground pressure machine utilizing a laser guiding system. Once rough grading is complete, soil will be tilled to the depth of 6" using a Excavator soil processor. This process will remove rocks and will provide existing soil with a uniform consistent profile for a healthier growing environment. Once subgrade and bleed, 2 to 3" of a 2mm sand will be graded and then tilled into soil. The infield clay will be tilled and subgrade 2 low prior to installing 2" of Dura Edge Native Premium Infield Mix -105 tons Rebuild mound to proper height. Dura Edge Pro Packing Clay will be used in the platform and landing area. The home plate clay will be properly graded, and Dura Edge Packing Clay will be used in the batters and catchers' boxes. Laser grade infield skin and soil to proper elevation and slope to within 1/4'. Install 21 ,500 Square feet of Kentucky Bluegrass Sod on entire remediation area. Fertilizer will be installed prior to sodding and lime will be placed on the sod at completion.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents