Similar Projects
Culley Crossing Phase 2
New Construction
Conception
$10,000,000 est. value
Huntsville, AL 35801

Village at Hays Reserve Apartment Complex
New Construction
Design
$60,000,000 est. value
Huntsville, AL 35810

Village at Hays Reserve Apartment Complex
New Construction
Design
$60,000,000 est. value
Huntsville, AL 35810

Material Exploitation Center (MEC) at Redstone Arsenal
Addition, Demolition, Infrastructure - 9,890 SF
Bidding
$250,000,000 CJ est. value
Redstone Arsenal, AL 35808

Madison Community Center
New Construction, Infrastructure
Bidding
$540,000 CJ est. value
Madison, AL 35758

Boardwalk at Research Park
New Construction - 320,943 SF
Post-Bid
$10,000,000 CJ est. value
Huntsville, AL 35806

Boardwalk at Research Park
New Construction - 320,943 SF
Post-Bid
$10,000,000 CJ est. value
Huntsville, AL 35806

Horizontal and Directional Bores for Madison County Water
Results
$147,000 est. value
Huntsville, AL 35811

Redstone Gateway Phase III
Infrastructure
Results
Huntsville, AL

Stoneridge Villas - Phase 2
New Construction
Construction
$9,500,000 est. value
Madison, AL 35757

Ariza Oakwood
New Construction - 3,413,229 SF
Construction
$10,000,000 CJ est. value
Huntsville, AL 35806

Manor On County Line Apartments
New Construction
Pending Verification
Huntsville, AL

Everstead Residential Development
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Madison, AL 35758

Oak Meadows
New Construction, Infrastructure
Design
Huntsville, AL 35810

Water Tank Rehabilitation
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Huntsville, AL 35811

Last Updated 09/12/2022 08:40 AM
Project Title

Zen Retreat

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35806   (Madison County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Parking Garage, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 of The Zen Retreat is the new construction of 5, 3 story buildings containing 120 units, a community building & pool, a 10 bay garage building, and a trash compactor enclosure

Details

3 Stories Above Grade, 132,830 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents