Similar Projects
Coliseum Medical Centers Freestanding Emergency Department
New Construction, Infrastructure
Conception
$11,928,250 CJ est. value
Bonaire, GA 31005

Install Construct Breakroom and Administrative Area Building 125
Addition, Demolition, Renovation, Infrastructure
Bidding
$25,000,000 CJ est. value
Robins AFB, GA 31098

Flournoy Road Paving
Infrastructure
Bidding
$432,000 CJ est. value
Elko, GA 31025

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Matt Arthur Elementary Parent Drop Off Improvements
Infrastructure
Post-Bid
Kathleen, GA 31047

Valve and Meter Boxes
Term Contract
Results
Warner Robins, GA

Site Clearing Of Retention Ponds
Alteration
Results
Warner Robins, GA

CRH Healthcare Shell Building / Bonaire
New Construction, Infrastructure - 4,000 SF
Construction
$800,000 CJ est. value
Bonaire, GA 31005

Bob White Storage Expansion / Perry
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$500,000 CJ est. value
Perry, GA 31069

Ashley Drive Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$93,000,000 CJ est. value
Perry, GA 31069

Guardrail Repairs on Moody Road
Infrastructure
Bidding
$830,000 CJ est. value
Warner Robins, GA 31088

Aquatic Center Site Work
Infrastructure
Post-Bid
$2,660,900 CJ est. value
Warner Robins, GA 31088

Sidewalk Work for Martin Luther King, Jr. Boulevard
Infrastructure
Results
$40,100 CJ est. value
Warner Robins, GA 31098

Jack Link's Manufacturing Faculty
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
Perry, GA 31069

Bonaire Middle and Huntington Middle FFA Barns
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Perry, GA 31069

Last Updated 07/11/2023 09:11 AM
Project Title

Water System Improvements Phase III to Serve Sewell Road

Physical Address View project details and contacts
City, State (County) Perry, GA 31069   (Houston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,054,089 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 11, 2023 project was awarded to John R. Walker., awarded amount is $1,054,088.80.** The project consists of, but is not limited to, the following major elements: Offeror agrees to furnish all materials and equipment and to perform all labor necessary to install +-9,570 LF of 12" PVC water main, +-1,180 LF of 12" Ductile Iron water main with restrained joints, fire hydrants, valves, fittings, and all related work. Time allotted for completion of Work is 150 consecutive ] calendar days from the date of a written "Notice to Proceed" from OWNER. All Work shall be completed in accordance with the plans and specifications. Proposals shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful offerors if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Award of Contract: June 20, 2023 *Notice to Proceed: July 31, 2023 *Date of Substantial Completion: December 28, 2023 Owner reserves the right to reject any or all Proposals, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Proposals and to reject the Proposal of any Offeror if Owner believes that it would not be in the best interest of the Project to make an award to that Offeror,

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents