Similar Projects
Reported | 09/02/2020 12:00 AM |
Project Title | Fiberglass Reinforced Plastic Density Current Baffles for CC Williams WWTP |
Physical Address | View project details and contacts |
City, State (County) | Mobile, AL 36603 (Mobile County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. This section includes fiberglass reinforced plastic (FRP) density current baffles for the final clarifiers at the Clifton e. Williams Wastewater Treatment Plant B. The material covered by these specifications shall be furnished by a reputable and qualified manufacturer of proven ability that is regularly engaged in the manufacture and installation of FRP products e. Fabricator shall be experienced in successfully producing FRP products specified for this project, with sufficient production capacity to produce required units without causing delay in the work. D. Fabricator shall provide a list of five (5) installations of comparable size in operation for at least three (3) years. E. Fabricator will produce a quantity of 210 FRP Density Current Baffles per scope of work, 70 per clarifier for a total of (3) clarifiers. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |