Similar Projects
Last Updated | 08/22/2022 06:03 AM |
Project Title | I-83 Resurfacing Exit 43 to Exit 48 |
Physical Address | View project details and contacts |
City, State (County) | New Cumberland, PA 17070 (York County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,884,988 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction activities include concrete patching, mill and overlay, and other miscellaneous activities, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0083, SECTION 102, in DAUPHIN COUNTY, HARRISBURG CITY, SWATARA & LOWER PAXTON TOWNSHIPS, from Cameron Street at Segment 0424 Offset 1860 (Segment 0425 Offset 1860) to Peiffers Lane at Segment 0474 Offset 0146 (Segment 0475 Offset 0111), for an overall project length of 47,688.00 linear feet (9.032 miles). The construction length is 25,472 linear feet (4.824 miles). Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 9.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays 408 Version: 2020-4 PennDOT - I-83 Resurfacing Exit 43 to Exit 48 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |