Similar Projects
Raritan River Bridge Replacement Construction Project Construction Contract No. 2
Renovation
Bidding

Deck Reconstruction; Milepost 98.4 to 98.7
Renovation
Bidding

Priority Repairs to County Bridges, Clay Street, Bridge Street and Jackson Street Movable Bridges in East Newark Harrison and Newark
Renovation, Infrastructure
Post-Bid
Harrison, Newark, NJ 07029

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

East 25th Street Pedestrian Bridge Replacement
Results
Bayonne, NJ 07002

Newark Bay Bridge
New Construction
Pending Verification
Bayonne, NJ

Inspections, Maintenance, Testing and Repair of the Carbon Monoxide ("Co") Monitoring Systems at the George Washington Bridge, and the Lincoln and Holland Tunnels
Results
Jersey City, NJ

Path - Replacement of the Hackensack Bridge Controls
Results
$5,000,000 to $10,000,000 est. value
NJ

Portal North Bridge Project
Results
NJ

Signature Bridge Preventive Maintenance Contract 2019-1
Results
$20,000,001 to $50,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair Contract, Statewide - 2021
Results
$10,000,001 to $20,000,000 est. value

Maintenance Orphan Bridge Repair Contract 2020-2
New Construction
Results
$5,000,000 est. value

Signature Bridge Preventive Maintenance Contract 2020-1
New Construction
Results
$10,000,001 to $20,000,000 est. value

Bridge Overlay Resurfacing Contract, Statewide - 2021
New Construction
Results
$5,000,001 to $10,000,000 est. value

Bridge Repairs and Resurfacing; Milepost 92 to 122; and the Newark Bay-Hudson County Extension (2022)
Renovation
Results

Last Updated 04/01/2022 03:28 AM
Project Title

William A Stickel Bridge Movable Bridge Elevator Replacement Contract

Physical Address View project details and contacts
City, State (County) East Newark, NJ 07029   (Hudson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,001 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1,068,000.00 Ls Tower Elevators 532,000.00 Ls Clearing Site, Bridge

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents