Similar Projects
Concrete; Paving, Slabs and Repair
Infrastructure
Bidding
$50,000 to $150,000 est. value

Street Sealcoat Maintenance
Infrastructure
Bidding
Sauk Centre, MN

Bituminous Paving of Vails Lake Road
Post-Bid
Paynesville, MN

Talahi and Kennedy Site Improvements 2021
Post-Bid
Waite Park, MN

Grading, Bituminous Surfacing and ADA Improvements
Results

228th Street Improvements Reclamation and Paving
Results
Saint Augusta, MN 56301

Street Crack Fill Maintenance
Infrastructure
Bidding
Sauk Centre, MN

North Smoky Hills Graveling
Renovation
Post-Bid

CR 186 Concrete Overlay
Results
$2,200,000 to $2,500,000 est. value
Sauk Centre, MN 56378

Construction of Sanitary Sewer, Water Main, Storm Sewer Improvements and Street Construction
Infrastructure
Bidding
$450,000 est. value
Albany, MN

South Junior High Site Reconfiguration
Post-Bid
$1,500,000 est. value
Saint Cloud, MN 56301

2021 Bituminous Patching
Results
$9,000,000 to $10,000,000 est. value
MN

2022 Street Reconstruction
Infrastructure
Bidding
MN

Asphalting Project
Infrastructure
Post-Bid
Rice, MN

Hadrian Road-Granite City Crossings and Lenzmeier Addition Drainage Improvements
Results
Saint Cloud, MN 56301

Reported 03/10/2022 12:00 AM
Project Title

Katherine Johnson Education Center Improvements

Physical Address View project details and contacts
City, State (County) Saint Cloud, MN 56303   (Stearns County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Construction of Miscellaneous Removals, Grading, Aggregate Base, Bituminous Pavement, Concrete Curb & Gutter, Concrete Sidewalk, Pavement Markings, Signage, Site Lighting, Storm Sewer, Storm Water Management, Site Lighting, Erosion Control and Turf Establishment at Katherine Johnson Education Center High in St. Cloud Minnesota

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents