Similar Projects
New Castle State Road 3 and East C.R. 200 North Forcemain Replacement
Infrastructure
Bidding
$4,500,000 to $5,000,000 est. value
New Castle, IN

2021 Sanitary Sewer Extensions - Contract B
Infrastructure
Bidding
Decatur, IN

Alexander Street Storm & Sanitary Sewer Installation
Post-Bid
Bremen, IN 46506

Jeffersonville CSO Storage Interceptor Phase 3
Post-Bid
Jeffersonville, IN

Madison Street and 65th Lane Sanitary Sewer Improvement
Results
Merrillville, IN 46410

LTCP Phase 5 - South Region CSO Abatement
Results
Noblesville, IN 46060

New Castle CSO Phase 4 Mitigation
Infrastructure
Bidding
$7,500,000 to $8,000,000 est. value
New Castle, IN

2020 Guaranteed Savings Contract Provider RFQ
Post-Bid
Muncie, IN 47302

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Anan Ulery Tile at CR 38 Relocation
Alteration
Bidding
Less than $230,000 est. value
IN

Sewer Construction Material
Term Contract
Post-Bid
Fort Wayne, IN

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

2021 Community Crossings Matching Grant
Infrastructure
Bidding
Newburgh, IN

Cass Street Bottleneck Removal
Post-Bid
Peru, IN

Sanitary Sewer Extension at the Shelbyville AASF/Readiness Center
Results
Shelbyville, IN 46176

Last Updated 02/03/2022 01:47 PM
Project Title

2021 Sanitary Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Warsaw, IN   (Kosciusko County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Storm and sanitary sewer and manhole rehabilitation including approximately 221 LFT of 6” CIPP lining, 4,337 LFT of 8” CIPP lining, 705 LFT of 10” CIPP lining, 665 LFT of 12” CIPP lining, 420 of 15” CIPP lining, 1,272 of 18” CIPP lining, 412 of 21” CIPP lining, 917 of 24” CIPP lining, manhole rehabilitation including: spray liner, replace or reset frame and cover, reconstruct chimney or chimney seal, grouting of voids, add wall section, constructing benchwall, and removing and grouting steps; approximately 10 spot repairs which include repairing sewer segments or installing new manholes; bypass pumping as needed, and all related pavement and concrete repair and restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents