Similar Projects
Sanitary Sewer Improvements to serve the Griswoldville Industrial Park
Infrastructure
Bidding
GA

Flowery Branch - Sanitary Sewer Replacement Martin
Infrastructure
Bidding
Flowery Branch, GA

Sewer and Stormwater Assessment Program on an Annual Contract
Term Contract
Post-Bid
GA

As-Needed Emergency Water And Sewer Repairs
Post-Bid
Cumming, GA

Disaster Recovery and Sewage Cleaning Services
Term Contract
Results
GA

2016 Splost North Mainland Phase II Pump Station Improvements
Results
Brunswick, GA 31520

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

W.B. Casey Water Resource Recovery Facility Influent Pump Stations Improvements
New Construction
Bidding
GA

Tunnel Hill Sewer Expansion Project
Post-Bid
Dalton, GA

Omnitrax Utility Extension
Results
Less than $589,472 est. value
Rincon, GA 31326

Arrendale State Prison Sanitary Sewer Improvements Phase 2
Infrastructure
Bidding
Alto, GA 30510

Naval Reserve Center Lift Station
Post-Bid
Columbus, GA

Six (6) Lift Station Pumps
Results
Less than $65,814 est. value
Thomasville, GA

Fieldstone Pump Station Elimination Project
Demolition, Infrastructure
Bidding
Conyers, GA 30013

Annual Contract for Closed Circuit Television Inspections
Term Contract
Post-Bid
GA

Reported 03/04/2022 12:00 AM
Project Title

Transfer Force Main and Lift Station

Physical Address View project details and contacts
City, State (County) Thomaston, GA   (Upson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to approx 10,300 LF of sanitary sewer force main, associated roadway patching/paving; construction of a new sanitary sewer lift station, inculding submersible pumps, valves, pipe fittings, precast wetwell, electrical work, gravity sewer modifications, gravel, drive, grading, fencing, site lighting, minor utility relocations, clearing and grubbing, erosion control, traffic control, and all other ancillary items for a complete force main and lift station installation.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents