Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Gisler Avenue Landscape Improvements - City of Costa Mesa
Infrastructure, Alteration
Conception
$350,000 est. value
Costa Mesa, CA 92626

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 CJ est. value
Orange, CA 92869

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Edinger Pump Station Replacement
Renovation
Post-Bid
Orange, CA 92866

First Street Slope Stabilization Project (Rebid2)
Infrastructure
Results
$4,482,892 CJ est. value
Santa Ana, CA 92701

Carbon Canyon Booster Pump Station No 3 Rehabilitation
Renovation
Results
Brea, CA

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
Anaheim, CA 92801

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Fire Station No. 4 Replacement - City of Laguna Beach
Demolition, New Construction, Infrastructure - 9,975 SF
Pending Verification
$6,100,000 CJ est. value
Laguna Beach, CA 92651

Adams Avenue Bicycle Facility - Fairview Road to Harbor Boulevard - City of Costa Mesa
Infrastructure
Conception
$1,500,000 est. value
Costa Mesa, CA 92627

Katella Terrace
Demolition, New Construction, Infrastructure - 10,581 SF
Design
$30,000,000 CJ est. value
Orange, CA 92867

FY 2021-22 Annual Pavement Preservation Project (Zone 6)
Infrastructure
Post-Bid
$6,220,000 CJ est. value
Yorba Linda, CA 92886

Last Updated 07/13/2023 06:05 AM
Project Title

Ford Road Wastewater Pump Station Improvement

Physical Address View project details and contacts
City, State (County) Newport Beach, CA 92660   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $799,777 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work necessary for the completion of this contract consists of (1) remove existing concrete curb, curb and gutter, driveway, sidewalk and all other flat work; (2) clean and remove existing 48-inch wet well and appurtenances;); (3) construct new 96-inch wet well and appurtenances; (4) remove and replace existing utilities for new wet well; (5) install generator and appurtenances; (6) construct concrete curb, curb and gutter, driveway, sidewalk and flat work; (7) restore landscaped slope and irrigation as necessary for new work; (8) install and maintain temporary bypass system; (9) all other incidental items to be completed in place required by the Plans and Specifications. Other Details Department of Industrial Relations (DIR) Noticing: No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Notes ORIGINAL SEALED COPY OF BIDDERS BOND MUST BE SUBMITTED TO THE CITY CLERK PRIOR TO BID OPENING DATE. All responses for this Bid are due at or before the time shown on each Notice Inviting Bids. Late responses will not be accepted. Hard copy responses of Submittals WILL NOT be accepted. The City is not responsible for and accepts no liability in the event a response is late due to any network, internet, or any other technical problem or interruption. Electronic PDF files of the plans, specifications and bid documents are available. The City is not responsible for any errors that may occur from the printing of any of these documents by bidders, including, but not limited to scaling issues, print quality, failure to print and submission of all required documents. Online Q&A Yes Q&A Deadline 05/30/2023 2:00 PM (PDT) Liquidated Damages $1,000 Per Day SCOPE OF WORK Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services required for the Project. All of the Work to be performed and materials to be furnished shall be in strict accordance with the provisions of the Contract Documents. Contractor is required to perform all activities, at no extra cost to City, which are reasonably inferable from the Contract Documents as being necessary to produce the intended results.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents