Similar Projects
Last Updated | 07/13/2023 06:05 AM |
Project Title | Ford Road Wastewater Pump Station Improvement |
Physical Address | View project details and contacts |
City, State (County) | Newport Beach, CA 92660 (Orange County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $799,777 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work necessary for the completion of this contract consists of (1) remove existing concrete curb, curb and gutter, driveway, sidewalk and all other flat work; (2) clean and remove existing 48-inch wet well and appurtenances;); (3) construct new 96-inch wet well and appurtenances; (4) remove and replace existing utilities for new wet well; (5) install generator and appurtenances; (6) construct concrete curb, curb and gutter, driveway, sidewalk and flat work; (7) restore landscaped slope and irrigation as necessary for new work; (8) install and maintain temporary bypass system; (9) all other incidental items to be completed in place required by the Plans and Specifications. Other Details Department of Industrial Relations (DIR) Noticing: No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Notes ORIGINAL SEALED COPY OF BIDDERS BOND MUST BE SUBMITTED TO THE CITY CLERK PRIOR TO BID OPENING DATE. All responses for this Bid are due at or before the time shown on each Notice Inviting Bids. Late responses will not be accepted. Hard copy responses of Submittals WILL NOT be accepted. The City is not responsible for and accepts no liability in the event a response is late due to any network, internet, or any other technical problem or interruption. Electronic PDF files of the plans, specifications and bid documents are available. The City is not responsible for any errors that may occur from the printing of any of these documents by bidders, including, but not limited to scaling issues, print quality, failure to print and submission of all required documents. Online Q&A Yes Q&A Deadline 05/30/2023 2:00 PM (PDT) Liquidated Damages $1,000 Per Day SCOPE OF WORK Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services required for the Project. All of the Work to be performed and materials to be furnished shall be in strict accordance with the provisions of the Contract Documents. Contractor is required to perform all activities, at no extra cost to City, which are reasonably inferable from the Contract Documents as being necessary to produce the intended results. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |