Similar Projects
Last Updated | 04/24/2021 02:16 AM |
Project Title | Installation of approximately 5.24 miles of high tension cable median barrier from the Henry/Bureau County Line to 0.42 miles West of 600E Rd |
Physical Address | View project details and contacts |
City, State (County) | IL (Bureau County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 64401100 Foot High Tension Cable Median Barrier Base Items 27,633.000 64401300 Each High Tension Cable Median Barrier Terminals Base Items 12.000 66900200 Cu Yd Non-Special Waste Disposal Base Items 1,365.000 66900530 Each Soil Disposal Analysis Base Items 5.000 66901001 l Sum Regulated Substances Pre-Construction Plan Base Items 1.000 66901003 l Sum Regulated Substances Final Construction Report Base Items 1.000 66901006 Cal Da Regulated Substances Monitoring Base Items 10.000 67100100 l Sum Mobilization Base Items 1.000 70100700 l Sum Traffic Control And Protection, Standard 701406 Base Items 1.000 70107025 Cal Da Changeable Message Sign Base Items 28.000 72501100 Each Terminal Marker - Post Mounted Base Items 12.000 78200021 Each High Tension Cable Median Barrier Reflectors Base Items 349.000 x0500002 Sq Yd Hot-Mix Asphalt Mow Strip Base Items 12,281.000 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |