Similar Projects
Last Updated | 11/05/2021 09:59 AM |
Project Title | 25E Proposed 36" Water Line Along Centerpoint Energy Corridor and Trickey Road from North Sam Houston Tollway to Spears Road Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX (Harris County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $9,000,000 to $10,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project includes the installation of approximately 8,740 linear feet of a 36-in. steel water transmission line, known as Project 25E. The proposed transmission line runs generally in the north-south direction and will be a secondary feed into the existing Spears Road Regional Pump Station from the future installation of the 84-in. water transmission line (Project 25D) along North Sam Houston Beltway 8. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |