Project Title

25E Proposed 36" Water Line Along Centerpoint Energy Corridor and Trickey Road from North Sam Houston Tollway to Spears Road Pump Station

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the installation of approximately 8,740 linear feet of a 36-in. steel water transmission line, known as Project 25E. The proposed transmission line runs generally in the north-south direction and will be a secondary feed into the existing Spears Road Regional Pump Station from the future installation of the 84-in. water transmission line (Project 25D) along North Sam Houston Beltway 8.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents