Similar Projects
Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

Underground Construction Contractor Transmission Water Mains
Post-Bid
Key West, FL

Construction Manager-at-Risk for Belmonte Road and Pershing Way Water and Sewer Improvements
Results
Less than $200,000 est. value
West Palm Beach, FL

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Pre-Qualification of Vendors Ductile Iron-Pipe and Fittings
Term Contract
Post-Bid
West Palm Beach, FL

South County Reclaimed Water Transmission Pipeline Phase 1A
Results
$7,000,000 est. value
West Palm Beach, FL

Furnish and Install 16-Inch Pvc 14-Inch HDPE ForceMain at N.E. 183Rd Road Street & Island Blvd
Post-Bid
$3,667,495 est. value
FL

Green Meadows Water Main Replacement
Results
Less than $250,000 est. value
Belleview, FL

Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

Infrastructure Locator Contractor
Term Contract
Results
Orlando, FL 32801

CDBG University Square Water Replacement
Results
Temple Terrace, FL 33617

North Byrom Street CDBG Project
Results
Less than $650,000 est. value
Milton, FL 32572

Poinciana Service Area Utility Construction Neighborhood 2 West, Village 7
Results
$3,100,000 est. value
Kissimmee, FL 34741

Fire Hydrant Repairs
Results
Less than $138,125 est. value
Mexico Beach, FL 32410

Prequalification of Companies to Bid Construction Services for the Pineda Causeway Water Transmission Mains Project
Results
Melbourne, FL 32901

Last Updated 06/15/2022 12:54 PM
Project Title

3rd Street Water Main Crossing at US 17-92 and SR 46 Force Main Extension

Physical Address View project details and contacts
City, State (County) Sanford, FL   (Seminole County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes directional drill construction of 250-ft of a new 12” new water main crossing of US 17-92 at 3rd St., and directional construction of 2,800-ft (+/-) of new 12” force main along SR 46 from Beardall Ave. to East Lake Mary Blvd. Open cut construction includes over 50-ft of 10”-12” water main and over 350-ft of 12” force main.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents