Similar Projects
Electric Meter Supply Contract
Term Contract
Sub-Bidding
Ames, IA 50010

Electric Distribution Line Relocation Installation
Renovation
Sub-Bidding
$25,000 CJ est. value
West Liberty, IA 52776

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Electric Vehicle Charging Station Installation
Term Contract
Post-Bid
Less than $25,000 est. value
Ames, IA 50010

Davenport AASF Generator Addition
Alteration
Results
Davenport, IA 52806

2021 HS Auditorium Audio Visual Improvements - Electrical
Alteration
Results
Des Moines, IA

Sound Masking at Ames Red Oak 1st, Black Oak 2nd, Hub 1st
Renovation
Sub-Bidding
$60,000 CJ est. value
Boone, IA 50036

Furnishing 15 KV Medium Voltage Power Cable
Alteration
Post-Bid
Pella, IA

HVAC and Electrical Improvements - Classrooms
Alteration
Results
Moravia, IA

Furnishing 161kV Breakers
Term Contract
Sub-Bidding
$450,000 CJ est. value
Atlantic, IA 50022

HP Aruba Datacenter Switch Refresh
Alteration
Post-Bid
West Des Moines, IA

Generator Installation Work at Winterset Municipal Utilities Power Plant
Alteration
Results
$1,075,000 est. value
Winterset, IA

ITS Infrastructure - I-80
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Williamsburg, IA 52361

Glenwood Resource Center (GRC) New Fire Sprinkler System
Renovation
Post-Bid
$500,000 CJ est. value
Glenwood, IA 51534

Okoboji Auditorium Renovation
Alteration
Results
Milford, IA 51351

Last Updated 06/30/2023 02:23 PM
Project Title

Install Runway And Taxiway Lighting

Physical Address View project details and contacts
City, State (County) Independence, IA 50644   (Buchanan County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $423,544,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Each bidder shall accompany its bid with bid security, as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon. The bidder's security shall be in an amount equal to 5% percent of the total amount of the bid. The bid shall contain no condition except as provided in the specifications. Base bid work within the Object Frees Zone (OFZ) for Runway 18/36, Taxiway A3, Taxiway B2 and a portion of Taxiway A between Taxiway A3 and Taxiway B3 shall be completed in twenty (20) working days. Two (2) additional working days will be awarded for Bid Alternate A. Ten (10) additional working days will be awarded for Bid Alternate B. Base bid work not completed as part of phase 1, when the runway and taxiway access to the apron is shut down, shall be completed under phase 2 work and be completed within twenty (20) working days. Total Working Days for Base Bid shall be forty (40) days The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this DOT-assisted contracts. In accordance with 49 CFR Part 26.45, the sponsor has established a contract goal of 4.6% participation for small business concerns owned and controlled by certified socially and economically Disadvantaged Business Enterprise (DBE) The City of Independence reserves the right to reject any and all bids, to waive informalities or technicalities in any bid, and to enter into such contract, or contracts, as it shall deem to be to the best interest of the City of Independence. Installation of new LED taxiway and runway lights

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents