Similar Projects
North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

MAPS4 - Animal Shelter - (Ward 7) - City of Oklahoma City
New Construction, Infrastructure
Conception
$29,162,700 CJ est. value
Oklahoma City, OK 73115

Interchange - IS 35
Infrastructure
Design
$30,900,000 CJ est. value
Oklahoma City, OK 73131

Utilities - IS 44
Infrastructure
Design
$1,030,000 CJ est. value
Oklahoma City, OK 73121

Grade, Drain, Surface and Bridge - I-40
Infrastructure
Bidding
$88,000,000 CJ est. value
Oklahoma City, OK 73145

MAPS 4 - Fairgrounds Coliseum
Renovation, Infrastructure
Bidding
$102,078,500 CJ est. value
Oklahoma City, OK 73107

Demolition of Hotel Building Will Rogers World Airport
Demolition, Infrastructure
Sub-Bidding
$185,000 CJ est. value
Oklahoma City, OK 73159

JFHQ Civil Improvements Phase 0 - Site Utilities Rebid - Bid Package #2
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Edmond, OK 73013

Civil Site Improvements
Infrastructure
Post-Bid
Oklahoma City, OK 73109

Air Force Life Cycle Management Center WAG B9201 Project, Tinker AFB
New Construction, Infrastructure - 35,000 SF
Post-Bid
$25,000,000 CJ est. value
Oklahoma City, OK 73145

Drill, Case and Complete Water Well | Lots 1,2,3,4 and S/2N/2 Sec 1-4N-13ECM
Infrastructure
Results
Oklahoma City, OK

Atoka Raw Water Pipeline Atoka Pump Station O to Coalgate Pump Station
Infrastructure
Results
$42,390,684 CJ est. value
Oklahoma City, OK 73102

Grace Church
New Construction
Construction
Oklahoma City, OK 73195

7-Eleven Store 42235 / Oklahoma City
Demolition, New Construction, Infrastructure - 4,788 SF
Construction
$2,500,000 CJ est. value
Oklahoma City, OK 73139

New Saigon Apartments
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Oklahoma City, OK 73106

Last Updated 09/13/2022 11:01 AM
Project Title

Heritage Church of Christ

Physical Address View project details and contacts
City, State (County) Edmond, OK 73034   (Oklahoma County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a church. As of September 13, 2022, a general contractor has been selected and construction is expected to begin late September 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents