Similar Projects
Hot Table Restaurant - Memorial Drive
New Construction - 2,070 SF
Design
Chicopee, MA 01021

Metro Chrysler Jeep Ram Dealership
Addition - 3,780 SF
Design
Chicopee, MA 01020

ADA Sidewalk Improvement Project (Re-Bid)
Infrastructure
Bidding
$135,000 CJ est. value
Springfield, MA 01103

Installation of Portland Cement Concrete Sidewalk
Infrastructure
Bidding
$135,000 CJ est. value
Longmeadow, MA 01106

Pizza Hut / Springfield
Renovation, Infrastructure - 2,050 SF
Sub-Bidding
$300,000 CJ est. value
Springfield, MA 01129

Pizza Hut / Springfield
Renovation, Infrastructure - 2,050 SF
Sub-Bidding
$300,000 CJ est. value
Springfield, MA 01129

Construction, Reconstruction, and Repair of Vaults, Penstocks
Alteration
Post-Bid
Holyoke, MA

Bituminous Paving at Hillside Cemetery
Infrastructure
Post-Bid
$390,000 CJ est. value
Monson, MA 01057

On-Call/Emergency Site Work/Excavation Services
Infrastructure
Results
$500,000 est. value
Springfield, MA

Buckley Boulevard Siphon Cleaning Structure
Infrastructure
Results
Less than $90,000 est. value
Chicopee, MA 01013

Pioneer Valley Fiberglass Pools
New Construction - 2,400 SF
Construction
$500,000 to $1,000,000 CJ est. value
Westfield, MA 01085

Citgo
Addition - 1,632 SF
Construction
Springfield, MA

Holiday Inn Express
Demolition, New Construction, Infrastructure - 63,735 SF
Pending Verification
$19,000,000 CJ est. value
West Springfield, MA 01089

Holiday Inn Express
Demolition, New Construction, Infrastructure - 63,735 SF
Pending Verification
$19,000,000 CJ est. value
West Springfield, MA 01089

Roberts Field Track Resurfacing Project
Infrastructure
Design
$600,000 CJ est. value
Holyoke, MA 01040

Last Updated 08/18/2022 11:31 AM
Project Title

United Congregational Church Redevelopment

Physical Address View project details and contacts
City, State (County) Holyoke, MA 01040   (Hampden County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Museum, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the renovation of a church into a museum, restaurant and motorcycle repair shop. As of August 17, 2022, this project is seeking approval from the Holyoke Planning Board. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Office Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Interior Planters and Artificial Plants, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents