Similar Projects
MATSCC Rainwater Replacement Project
Post-Bid
Philadelphia, PA 19123

Powelton Yard Improvement Project - Mechanical Construction
Alteration
Post-Bid
Philadelphia, PA 19104

Episcopal Hospital Boiler Plant Upgrade - Mechanical
Results
$280,200 est. value
Philadelphia, PA 19125

Boiler Replacement at Andrew J. Morrison Elementary School - Mechanical
Results
Less than $2,007,277 est. value
Philadelphia, PA 19120

H245--Boiler Safety Device Testing Philadelphia VAMC
Term Contract
Post-Bid
Philadelphia, PA 19104

Boiler Replacement at Andrew J. Morrison Elementary School - General
Results
Less than $137,297 est. value
Philadelphia, PA 19120

SEPTA Platforms Improvements - Mechanical
Alteration
Post-Bid
$1,000,000 to $2,000,000 est. value
Philadelphia, PA 19153

ATC Replacement at Pennypacker Elementary School - Mechanical
Results
Less than $786,971 est. value
Philadelphia, PA 19138

Heater
Alteration
Post-Bid
Philadelphia, PA

Engine 11 Fire House Renovations Mechanical
Results
$300,000 to $500,000 est. value
Philadelphia, PA 19147

Tasker Morris Station ADA Upgrades- MC
Term Contract
Post-Bid
Philadelphia, PA 19145

Mechanical - HVAC Building Restacking Project
Results
Philadelphia, PA 19122

Heater
Alteration
Post-Bid
Philadelphia, PA

Police District 15 Building Renovations - Mechanical Construction
Results
$1,000,000 to $2,000,000 est. value
Philadelphia, PA 19149

Wayne Junction Static Frequency Converters (SFC) Rehabilitation - Mechanical Construction
Alteration
Post-Bid
Philadelphia, PA 19144

Last Updated 06/08/2022 07:53 AM
Project Title

Major Renovations at Edwin Forrest School - Mechanical Contract

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19136   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,874,378 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of an educational facility in Philadelphia, Pennsylvania. Completed plans call for the renovation of a educational facility. The School District will only accept bids from companies that have been placed on its current Pre-Qualified Contractors List as shown at portal All School District Project require MBE/WBE participation as shown in the specifications. Major Renovation at Edwin Forrest School Mechanical Contract $4,874,378 2020/21 The Office of Capital Programs reserves the right to reject any and all bids and make the awards to the best interests of the School District of Philadelphia. SDP CONTRACT NOS. B-057C, B-058C, B-059C AND B-060C OF 2020/21 MBE Range: 15%-20% WBE Range: 10%-15% 1.The exterior site work includes repairs to the exiting storm drainage system, sidewalk replacement, site fencing and gates repair / replacement, asphalt paving restoration, landscaping, playground painting, and pavement removal and replacement in coordination with new perimeter drainage piping, exterior stairs, and window wells. Existing exterior steps will also be repaired. The main building interior renovations include new finishes, new and / or refinished doors, frames, and hardware throughout all classroom, support, and circulation spaces. Select areas will be reconfigured to provide new specialty classrooms and new accessible student toilet rooms. A new commercial kitchen and kitchen support space will be provided and connected to the Gymateria with a new ramp and steps. 3. The main building exterior renovations include new roofing systems and associated roof accessories. The main building will undergo masonry facade repair work including lintel replacement, cleaning and repointing of masonry, and new coatings. Windows will be replaced throughout the facade. 4. The LSH exterior renovations include new roofing systems, and associated roof accessories as well as concrete repair work. Windows will be replaced throughout the facade. 5. The main building will have new heating and air-conditioning systems, including new boilers, pumps, and associated piping. New rooftop HVAC equipment is to be installed with steel support structures. 6. The main building will have new plumbing fixtures will replace existing fixtures. New hot water heaters, domestic water booster pumps, domestic hot and cold water piping, sanitary and storm piping are to be installed as indicated on drawings. New PGW gas service and new gas booster pumps and associated gas piping to new kitchen, plumbing and HVAC equipment. 7. The main building renovations include new LED luminaires and controls, exit signs, and exterior lighting. A new electrical service, including new switch gear, new panels and feeders, and an outdoor diesel generator will be provided. All branch circuit wiring and electrical devices will be replaced throughout the building. New network infrastructure cabling and devices are to be installed throughout the building. A new wireless clock system and security cameras and motion detectors will be installed throughout the building. 8. LSH building renovations include new plumbing fixtures will replace existing fixtures, a new toilet room radiant panel, new LED luminaires and controls, new wiring and electrical devices, new infrastructure cabling and devices, new wireless clocks, and speakers. Substantial Completion: NO LATER THAN AUGUST 12, 2023 Final Completion: NO LATER THAN OCTOBER 28, 2023

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Humidity Control Equipment, Mechanical Dehumidification Units.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents