Similar Projects
Intersection Improvement at SR 53 at Mulberry Road - Barrow County
Infrastructure
Conception
$250,000 CJ est. value
Winder, GA 30680

Intersection Improvement at SR 53 at Mulberry Road - Barrow County
Infrastructure
Conception
$250,000 CJ est. value
Winder, GA 30680

Passport Springs & Spa
New Construction, Infrastructure - 150,000 SF
Design
$30,000,000 CJ est. value
Cumming, GA 30040

SR 333 From CS 720 / Bartow St to S of CR 183 / Webster St - Tia
Infrastructure
Design
$900,000 CJ est. value
Quitman, GA 31643

South Central Wastewater Treatment Plant Aerator Addition
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Douglasville, GA 30135

South Central Wastewater Treatment Plant Aerator Addition
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Douglasville, GA 30135

Street Sweeping
Post-Bid
Alpharetta, GA

FedEx
Infrastructure
Post-Bid
Statesboro, GA 30458

SPLOST VII Sidewalk Project
Results
Albany, GA

T32-D6-Ppv-Crack Seal-A1-115640
Results

North Fulton Expressway Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Alpharetta, GA 30009

Highway 16 East Warehouse
New Construction, Infrastructure - 479,520 SF
Pending Verification
$50,000,000 CJ est. value
Newnan, GA 30263

Bland Tract Subdivision
New Construction, Infrastructure
Conception
$55,000,000 CJ est. value
Statesboro, GA 30461

SR 76 / SR 333 From CS 735 / Crawford Street to SR 38 / US 84-tia
Infrastructure
Design
$500,000 CJ est. value
Quitman, GA 31643

Polk Street at Mountain View Road Intersection Improvement Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Marietta, GA 30064

Last Updated 09/30/2022 04:32 AM
Project Title

CS 841 / N Highland Street From SR 38 / US 84 to Olegsby Ave-tia

Physical Address View project details and contacts
City, State (County) Quitman, GA 31643   (Brooks County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This TIA Project includes sidewalk, drainage improvements, and resurfacing on North Highland Road in the City of Quitman beginning at US 84/SR 38 and ending at Highland Circle. Total project length is 0.42 miles. County: Brooks As of September 30, 2022, the project is in Final Planning status. Anticipated letting Month is September, 2022. GADOT - CS 841 / N Highland Street From SR 38 / US 84 to Olegsby Ave-tia *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents