Similar Projects
Torry Gym Exterior Improvements
Infrastructure, Renovation
Bidding
$240,000 CJ est. value
Washington, IL 61571

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Panda Express / Pekin
New Construction, Infrastructure - 2,229 SF
Post-Bid
$680,000 CJ est. value
Pekin, IL 61554

Lincoln ES & SHS Site Improvements
Infrastructure
Results
Morton, IL 61550

Installation of New Traffic Signals, Pavement Markings, ADA Ramp, Curb and Gutter, Riprap, Median Reconstruction
Infrastructure
Results
$649,720 CJ est. value
Pekin, IL 61554

Water System Improvements
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Groveland, IL 61535

Agriculture Storage Building for Illinois Central College
New Construction, Infrastructure
Results
$2,297,000 CJ est. value
East Peoria, IL 61635

Construction of the Erie Court Watermain Extension Project
Infrastructure
Post-Bid
$455,000 CJ est. value
Morton, IL 61550

Replace Expansion Joints and Partial Depth Deck Patching
Infrastructure
Results
$371,800 CJ est. value
Pekin, IL 61554

Street Reconstruction
Infrastructure
Post-Bid
$1,396,709 CJ est. value
Washington, IL 61571

District Wide Smart Work Zone Technology
Infrastructure
Results
$419,500 CJ est. value
Morton, IL 61733

HMA Milling and Overlay; Class D Patches
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Morton, IL 61733

Hot-in-place Recycling of Existing Asphalt Pavement; Aggregate Wedge Shoulders; New Pavement Markings
Infrastructure
Post-Bid
$300,000 CJ est. value
Creve Coeur, IL 61610

Wesley Road Pavement Rehabilitation
Infrastructure
Post-Bid
$790,000 CJ est. value
Creve Coeur, IL 61610

3000 Square Yards of Surface Removal
Infrastructure
Post-Bid
$500,000 CJ est. value
Pekin, IL 61554

Last Updated 03/20/2023 10:14 AM
Project Title

Bunker Renovation at Lick Creek Golf Course

Physical Address View project details and contacts
City, State (County) Pekin, IL 61554   (Tazewell County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Golf Course, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $100,300 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Awarded to Larry Denton Golf Course Construction & Renovation, LLC Bunker Renovation at Lick Creek Golf Course, 2323 Sheridan Road, Pekin, Illinois, 61554 Renovate or removal of all 59 bunkers on the property. There is approximately 80,000 to 90,000 sq. ft. of area to be renovated or removed. We would like to reduce our bunker sq. footage to around 50,000 sq. ft., this will help us keep our maintenance cost in line with our budget. Removal of a bunker - Remove all existing sand, reshape and slope the existing banks and slopes for ease of maintenance by rotary mowers, install drainage as necessary. Prepare the old removed bunkerand surrounding construction area for sod. Must meet approval of owner's representative. All sod and labor to install sod to be provided by owner. Renovation of a bunker- Removal of all old material, reshape, redesign, install proper drainage consisting of 4" perforated tile covered with pea gravel, create a low maintenance flat bottom bunker. Prepare banks and surrounding construction area for sodding. Must meet the approval of the owner's representative. Sod and labor to install sod to be provided by owner. Install approximately 22 tons per bunker of Pro Angle Sand at a depth of 4" over the entire bunker. Sand to be provided by the owner. Total bunkers 59 We are wanting to remove 12 bunkers and renovate 47 Contracts for work under this bid will obligate the contractor and sub-contractors not to discriminate in employment practices and shall be in compliance with applicable State of Illinois Statutes pertaining to the selection of labor and the prevailing rate of wages. The contractor shall pay not less than the prevailing rate of wages as found by the Department of Labor of the State of Illinois or the Pekin Park District to all laborers, workmen, and mechanics performing work under this contract, as required by an act of the Illinois General Assembly entitled "An Act Regulating Wages of Laborers, Mechanics, and Other Workmen Employed in any Public Works by the State, County, City of any Public Body, or any Political Subdivision of By Anyone Under Contract for Public Works", approved June 16, 1941, as amended. The Pekin Park District reserves the right to reject bid quotes, waive irregularities in the bidding, and to award the bid in the best interest of the Pekin Park District. All questions on the bid documents and scope of work shall be directed to Greg Funk, Superintendent of Golf, 309-258-4686, or gfunk@pekinparkdistrict.org. No change to the original bid documents and/or the scope of work is approved, unless a written addendum is issued to all bidders by 5:00 p.m., February 8, 2023. The Contractor will be required to commence active work on the project no later than May 1, 2023, and to complete the work by December 31, 2023

Details

Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 22 - Plumbing, Facility Sanitary Sewerage, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents