Similar Projects
Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

4 Winds Boulevard Apartments
New Construction, Infrastructure
Conception
$55,000,000 CJ est. value
Kissimmee, FL 34746

Nolte Road Commercial Park Master Plan
New Construction
Design
Saint Cloud, FL 34772

SkydiveXperience
New Construction, Infrastructure - 30,000 SF
Design
$45,000,000 CJ est. value
Kissimmee, FL 34747

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Everest Physical Rehabilitation Hospital
New Construction, Infrastructure - 38,129 SF
Bidding
$21,500,000 CJ est. value
Kissimmee, FL 34741

O'Reilly Auto Parts / Kissimmee
New Construction, Infrastructure - 7,500 SF
Post-Bid
$300,000 CJ est. value
Kissimmee, FL 34746

Storcon Self-Storage Facility
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Buena Ventura Lakes, FL 34743

Site Work Contractor Services
Term Contract, Alteration
Results
FL

Taxiway E Extension (24 END) and Obstruction Removal at Kissimmee Gateway Airport
Infrastructure
Results
$7,770,206 CJ est. value
Kissimmee, FL 34741

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Encompass Health Rehabilitation Hospital of Kissimmee Phase 1
New Construction, Infrastructure - 52,470 SF
Construction
$35,000,000 CJ est. value
Kissimmee, FL 34746

Canoe Creek Road Widening Project - Osceola County
Infrastructure
Pending Verification
$700,000 CJ est. value
Saint Cloud, FL 34773

Comfort Inn & Suites and Mainstay Suites
Demolition, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Kissimmee, FL 34744

American Homes 4 Rent / St. Cloud
New Construction, Infrastructure
Conception
$87,000,000 CJ est. value
Saint Cloud, FL 34769

Last Updated 02/16/2023 05:34 AM
Project Title

RFP Construction Manager at Risk - Center for Neovation Expansion

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34744   (Osceola County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $23,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Center for Neovation, an Advanced Manufacturing Semiconductor Fabrication Lab located at 200 NeoCity Way, NeoCity, FL 34744, is renovating, upgrading, facilitating and installing process equipment within the remaining open areas of the existing facility and requires proposals for the design and construction management of the modifications. This project will be partially funded with Federal funds from the United State Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with that program. 1. The purpose of this Scope of Services is to obtain proposals from qualified Construction Managers at Risk (CMAR) for the modification and renovation of the facility and infrastructure to support such. Infrastructure Improvements scope will include, expanding and upgrading cleanroom space for Advanced Packaging Processing including modifications and expansion of the existing filtration, HVAC, and exhaust systems, increasing of the Ultra-Pure Water Treatment plant capacity, expansion and modification of the distribution of the existing Ultra Clean Process Services, chemical distribution and collection services and systems, and the required electrical service modifications and additions, to support the expansion, including improving Emergency Backup Power Capabilities (UPS) for Semiconductor Tools, Equipment and Machinery. 2. The Construction Management firm will participate in the design, permitting and post-design services, supplying assistance during the design process to resolve constructability issues and ensuring the project remains on budget and schedule. Question End Date 1/6/2023 12:00 PM Insurance Required Yes Bid Bond Required Yes Performance Bond Required Yes MBE (15.5%), WBE (6.9%) Shortlist Confirmed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents